Top-rated new roof installation · 4.9 on Google
Professional New
Roof Installation
Ocean Seven Builders provides professional new roof installation for new homes, room additions and second stories. As a general contractor that started in roofing, we plan the roof together with the structure, so it is detailed properly from the first rafter to the final flashing.
- Licensed & insured · CSLB #893048 · B-General · C-39 Roofing
- In-house roofing crews
- Planned with the whole build
Our crew installing roof decking on an Ocean Seven project
New roof installation
Professional new roof installation, planned with the structure.
A new roof installation on a new home or an addition is different from replacing an old roof. There is no existing roof to match or remove, but there are many decisions to make early. The roof shape, pitch, material and drainage all affect the framing, the engineering, the exterior design and the budget, so they are best settled before construction begins.
Because Ocean Seven Builders is both a new construction contractor and a roofing company, our new roof installation work starts at the design stage. We review the plans for roof pitch, valleys, drainage and penetrations, confirm that the framing suits the chosen material, and then build the roof with our own crews. The result is a roof that is detailed as part of the house rather than added at the end.
This matters most where new meets old. On a room addition or a second story, the new roof has to tie into the existing roof without creating a valley or wall joint that will leak later. Those transitions are where many additions fail, and they are exactly where roofing experience pays off.
- Roofs for new homes, additions and second stories
- Tile, shingle, metal and polyurethane foam systems
- Framing, pitch and drainage reviewed before building
- Clean tie-ins between new and existing roofs
New roofs explained
A homeowner’s guide to new roof installation.
Why the roof belongs in the design stage
On a new home or addition, the roof is often treated as a finish, chosen late and squeezed into whatever the framing allows. That approach causes problems. The roofing material decides how much weight the structure must carry, the pitch decides which materials will work, and the drainage layout decides where gutters, downspouts and scuppers go. Therefore, the best time to plan a new roof installation is while the plans are still being drawn, when changes cost nothing but a revision.
Matching the material to the structure
Every roofing system has requirements. Clay and concrete tile need framing designed for their weight and a minimum pitch. Architectural shingle suits a wide range of slopes and adds far less load. Standing seam metal needs long, simple roof planes to look its best, while seamless polyurethane foam is the strongest option for flat and low-slope roofs. As a result, the material choice and the structural design should be made together, and our roofing materials guide compares them in detail.
Tying a new roof into an existing house
Additions and second stories bring a special challenge: the new roof has to meet the old one. Where the two connect, water collects in new valleys and runs along new wall joints. If those transitions are not flashed carefully, they become the first place the house leaks. In some cases, part of the existing roof is re-roofed so that the new and old sections share continuous underlayment and flashing. We review these details on every addition before the framing goes up.
Ventilation and energy performance
A roof has to manage heat and moisture as well as rain. Intake vents at the eaves and exhaust vents near the ridge let the attic breathe, which keeps the roof deck dry and helps the roofing last longer. On flat roofs, polyurethane foam adds insulation as well as waterproofing, and reflective coatings reduce heat gain. These choices are easiest to make on a new build, when insulation, ventilation and roofing can be designed as one system.
Permits and inspections
A new roof installation is almost always part of a permitted project. The roof appears on the permit drawings, the framing and decking are inspected, and the finished roof is checked as part of the final inspection. Because we handle the construction and the roofing, we coordinate those inspections within the overall schedule. Our permit guide explains the process.
Getting the details right from day one
The advantage of a new roof is that nothing is hidden. Every layer, from decking to flashing to the finished surface, is installed new and inspected. That is a rare opportunity to build a roof exactly as it should be, and it is why we treat new roof installation with the same care as our roof replacement work.
Related roofing services
Talk with a professional
Get honest advice and a fixed, line-item proposal from a top-rated team.
When you need it
When a new roof installation is the right call.
A new roof installation is part of many projects. These are the situations where we install a roof from the deck up rather than repairing or replacing an existing one.
Building a new home
A custom home needs a roof designed with its framing, insulation, ventilation and exterior style.
Adding a room
A single-story addition needs its own roof plus a careful tie-in to the existing roof.
Adding a second story
Building up usually means a completely new roof over the whole house.
Building an ADU or guest house
Detached units need a roof that suits their size, style and drainage.
Rebuilding after damage
After fire, storm or structural damage, the roof is rebuilt as part of the repair.
Changing the roof shape
Converting a flat roof to a pitched one, or reshaping a roofline, is a new roof installation.
Converting a garage or patio
Enclosing space often means upgrading a light roof to a fully waterproof system.
Changing material type
Switching to tile or metal can mean new framing, decking and a fully new roofing system.
Replacing a worn roof on an existing home instead? See roof replacement. Comparing materials first? Our roofing materials guide sets them side by side.
What is included
What our new roof installation includes.
A roof is a system of layers. For a new roof installation we build every one of them, starting with the structure that carries it.
New decking and underlayment going down on an Ocean Seven roof
Plan and structural review
We review the roof plan, pitch and framing with the design team, so the structure suits the chosen material.
Decking
Structural sheathing is installed and fastened to the specified pattern, giving the roofing a solid, flat base.
Underlayment
Underlayment covers the whole deck, with extra protection in valleys, at eaves and around penetrations.
Flashing at every transition
Walls, valleys, chimneys, skylights and vents receive new flashing designed for the roofing system.
Ventilation
Intake and exhaust vents are planned so the attic or roof assembly can breathe and stay dry.
The roofing system
Tile, architectural shingle, standing seam metal or polyurethane foam, installed to the manufacturer’s requirements.
Edges, gutters and inspection
Drip edges, gutter connections and final details are completed, and the roof is inspected as part of the permit.
Roofing systems
Choosing the best roof for a new build.
On a new build you are free to choose the roofing system, as long as the structure is designed for it. These are the systems we install.
Long-lasting and suited to Spanish and Mediterranean design. Tile is heavy, so the framing is engineered for it from the start.
Best for: Spanish and Mediterranean homes
Material reference image
Versatile, lighter and available in many colors, shingle suits most pitched roofs on new homes and additions.
Best for: traditional and transitional homes
Ocean Seven project
Clean lines and concealed fasteners for contemporary designs with long, simple roof planes.
Best for: modern architecture
Material reference image
Seamless foam for flat and low-slope roofs, built up to drain and then coated for protection.
Best for: flat and low-slope roofs
Ocean Seven project
How it works
How a new roof installation runs.
On a new build, the roof follows the framing. These five steps show how it fits into the wider project.
Design review
We review the roof plan, pitch, drainage and material with you and the design team.
Line-item proposal
The roofing scope is priced separately in the proposal, so you can see exactly what it includes.
Permit & framing
The roof is included in the permit drawings, and the framing is built and inspected to suit it.
Roof installation
Our crew installs decking, underlayment, flashing and the roofing system, then completes ventilation and edges.
Inspection & warranty
The roof is inspected with the project, and you receive the workmanship and manufacturer warranty documents.
Planning your budget
What affects the cost of a new roof installation.
Every new roof is designed for its building, so we price it from the plans. These are the factors that drive the cost.
Roof area and pitch
Larger areas and steeper slopes take more material, labor and safety setup.
Roof complexity
Valleys, hips, dormers and changes in height add flashing and cutting work.
Material choice
Tile, shingle, metal and foam differ in material cost and installation time.
Structure required
Heavier systems such as tile need framing designed to carry the load.
Tie-ins to an existing roof
Additions need careful connections to the existing roof, sometimes with partial re-roofing.
Penetrations and solar
Skylights, vents, chimneys and solar mounts all need proper flashing.
How we price it: new roofs are priced from the approved plans in a fixed, line-item proposal. Our guide to permits explains how the roof fits into plan check and inspections.
Why Ocean Seven
Why homeowners choose our top-rated roof installation team.
A new roof is only as good as its details. These are the reasons homeowners trust us to build it as part of their project.
Builder and roofer in one
The same company frames the structure and installs the roof, so nothing falls between trades.
Roofing is our origin trade
Ocean Seven began as a roofing crew, and roofing remains a core specialty.
Careful tie-ins
Where new roofs meet existing ones, transitions are detailed to keep water out for the long term.
Licensed, bonded & insured
CSLB License #893048, B-General and C-39 Roofing. You can verify it with the Contractors State License Board.
What clients say
What homeowners say about their projects.
Selected excerpts from public Google and Yelp reviews of Ocean Seven Builders, quoted as written.
Ocean Seven Builders handled both our new roof and a room addition, and it was a big project for us. Ron made the whole thing feel manageable. … The addition took a bit longer, but the end result looks great and feels like it’s always been part of the home.
Patricia Mace
Google review · Roofing + addition
Our home needed a new roof badly, and while we were already remodeling, we decided to update the master bathroom too. Ocean Seven Builders handled both projects and did an incredible job. … the new roof completely changed the appearance of our house.
Crystal Green
Google review · Roofing + bathroom
He was really easy to deal with and explained everything really well. He does not use subs, his people work for him. Ron was also at the job every day and made sure I knew what was going on.
Kenny MacPherson
Google review · Roof replacement
Homeowner guides
Roofing & building guides for homeowners.
Reading before you plan a new roof: choosing the best roofing material, repair or replace, and how permits work.
Roofing Guides
November 10, 2026
Roofing Guides
November 5, 2026
Roofing Guides
October 27, 2026
Roofing FAQ
Roofing questions, answered by professionals.
Repair or replace, which material, permits, leaks and warranties: straight answers from a roofing contractor that started as a roofing crew.
How do I know if my roof needs repair or replacement?
Isolated problems, such as a failed flashing or a small damaged area, can usually be repaired. However, when leaks keep returning, the underlayment has reached the end of its life, or the decking is soft in several places, replacement is normally the better long-term value. An inspection tells you which situation you are in. Learn more about roof repair and roof replacement.
What roofing materials do you install?
We install clay and concrete tile, architectural asphalt shingle, standing seam metal and seamless polyurethane spray foam for flat and low-slope roofs. Each suits a different roof shape and house style, so our guide to the best roof for Los Angeles homes and our page on roofing materials & options compare them.
What is a polyurethane foam roof?
Polyurethane foam is sprayed on as a liquid, expands into a seamless surface and is then protected with a coating. Because there are no seams to fail, it is well suited to flat and low-slope roofs where water would otherwise collect. It is the company’s roofing specialty.
How long does a roof replacement take?
It depends on the size of the roof, the system, the tear-off and the weather. As a guide, the company’s typical range for a polyurethane foam re-roof is two to five days. Your schedule is confirmed in the proposal after an inspection.
Do I need a permit to replace my roof?
In most Los Angeles-area cities, a roof replacement requires a permit and inspections. We coordinate the permit and inspections as part of the project. Our guide to home improvement permits in Los Angeles explains the process.
Can you find and fix a roof leak?
Yes. A ceiling stain is not always directly under the leak, because water travels along decking and framing first. We trace the source, which is often flashing, a roof penetration or a valley, and then repair it. See roof leak repair.
Do you offer roof inspections?
Yes. An inspection looks at the roof surface, flashing, penetrations, drainage and, where accessible, the decking and underlayment. It is also the first step before any repair or replacement proposal. See roof inspections.
Can you help with a roof insurance claim?
The company lists insurance claim work as part of its roofing service. We can inspect and document the damage and prepare a scope of repair. Coverage decisions, however, are made by your insurance company.
What happens if the wood under my roof is damaged?
Damaged decking is replaced before the new roof goes on, because a new roof is only as sound as what it is attached to. The proposal explains how decking replacement is handled so there are no surprises.
Can I switch from shingles to tile?
Often, yes. Tile is considerably heavier than shingle, though, so the roof framing has to be checked first and may need strengthening. We confirm this before you commit. Learn more about tile roofing and shingle roofing.
Do you work on flat and low-slope roofs?
Yes. Flat and low-slope roofs are a core part of the company’s roofing work, including seamless polyurethane foam systems. See flat & low-slope roofing.
What warranty comes with a new roof?
Every project carries a written workmanship warranty, along with the manufacturer’s warranty on the roofing system. Specific terms and periods are set out in your contract.
Where we work
Service areas across Los Angeles & beyond.
As a Los Angeles general contractor based in Van Nuys, we serve homeowners across Los Angeles County, Orange County, San Bernardino County and Marin County.
Los Angeles County
- Agoura Hills
- Alhambra
- Altadena
- Arleta
- Bel Air
- Beverly Glen
- Beverly Hills
- Brentwood
- Burbank
- Calabasas
- Canoga Park
- Cerritos
- Eagle Rock
- Encino
- Glendale
- Hawthorne
- Hidden Hills
- Highland Park
- Hollywood
- La Cañada Flintridge
- Lake Balboa
- Lakewood
- Malibu
- Manhattan Beach
- Marina del Rey
- Mission Hills
- Monrovia
- Newhall
- North Hollywood
- Panorama City
- Pasadena
- Redondo Beach
- Reseda
- San Gabriel
- Santa Monica
- Sherman Oaks
- Sierra Madre
- South Pasadena
- Studio City
- Tarzana
- Valley Glen
- Valley Village
- Van Nuys
- Venice
- West Hollywood
- Winnetka
- Woodland Hills
Orange County
San Bernardino County
Marin County
Ventura County
Riverside County
One office, not a network of branches. Everything runs out of 15155 Stagg St Unit # 2, Van Nuys, CA 91405. These are the areas our crews travel to; there is no branch office in any of them.
Homeowner guides
From the Ocean Seven blog.
Practical guides from a Los Angeles general contractor on roofing, additions, kitchens and permits, so you can plan your project with confidence.
New Construction Guides
November 15, 2026
Room Addition Guides
November 13, 2026
Bathroom Remodeling Guides
November 12, 2026
Start your project
Talk with a Los Angeles general contractor.
Tell us roughly what you have in mind. Then we will come out, measure, listen and send a fixed line-item proposal, free and with no pressure attached.
Phone
Office
Ocean Seven Builders, Inc.
15155 Stagg St Unit # 2
Van Nuys, CA 91405
Get directions
Hours
Monday–Friday 7:00am–7:00pm
Saturday 8:00am–4:00pm · Sunday closed
License
CSLB #893048 · B-General · C-39 Roofing
Licensed, bonded & insured
Request a consultation
Six quick fields. A sentence or two about the project is plenty.