Top-rated new roof installation · 4.9 on Google

Professional New
Roof Installation

Ocean Seven Builders provides professional new roof installation for new homes, room additions and second stories. As a general contractor that started in roofing, we plan the roof together with the structure, so it is detailed properly from the first rafter to the final flashing.

Ocean Seven roofers working on new roof decking during a shingle roof replacement

Our crew installing roof decking on an Ocean Seven project

New roof installation

Professional new roof installation, planned with the structure.

A new roof installation on a new home or an addition is different from replacing an old roof. There is no existing roof to match or remove, but there are many decisions to make early. The roof shape, pitch, material and drainage all affect the framing, the engineering, the exterior design and the budget, so they are best settled before construction begins.

Because Ocean Seven Builders is both a new construction contractor and a roofing company, our new roof installation work starts at the design stage. We review the plans for roof pitch, valleys, drainage and penetrations, confirm that the framing suits the chosen material, and then build the roof with our own crews. The result is a roof that is detailed as part of the house rather than added at the end.

This matters most where new meets old. On a room addition or a second story, the new roof has to tie into the existing roof without creating a valley or wall joint that will leak later. Those transitions are where many additions fail, and they are exactly where roofing experience pays off.

New roofs explained

A homeowner’s guide to new roof installation.

Why the roof belongs in the design stage

On a new home or addition, the roof is often treated as a finish, chosen late and squeezed into whatever the framing allows. That approach causes problems. The roofing material decides how much weight the structure must carry, the pitch decides which materials will work, and the drainage layout decides where gutters, downspouts and scuppers go. Therefore, the best time to plan a new roof installation is while the plans are still being drawn, when changes cost nothing but a revision.

Matching the material to the structure

Every roofing system has requirements. Clay and concrete tile need framing designed for their weight and a minimum pitch. Architectural shingle suits a wide range of slopes and adds far less load. Standing seam metal needs long, simple roof planes to look its best, while seamless polyurethane foam is the strongest option for flat and low-slope roofs. As a result, the material choice and the structural design should be made together, and our roofing materials guide compares them in detail.

Tying a new roof into an existing house

Additions and second stories bring a special challenge: the new roof has to meet the old one. Where the two connect, water collects in new valleys and runs along new wall joints. If those transitions are not flashed carefully, they become the first place the house leaks. In some cases, part of the existing roof is re-roofed so that the new and old sections share continuous underlayment and flashing. We review these details on every addition before the framing goes up.

Ventilation and energy performance

A roof has to manage heat and moisture as well as rain. Intake vents at the eaves and exhaust vents near the ridge let the attic breathe, which keeps the roof deck dry and helps the roofing last longer. On flat roofs, polyurethane foam adds insulation as well as waterproofing, and reflective coatings reduce heat gain. These choices are easiest to make on a new build, when insulation, ventilation and roofing can be designed as one system.

Permits and inspections

A new roof installation is almost always part of a permitted project. The roof appears on the permit drawings, the framing and decking are inspected, and the finished roof is checked as part of the final inspection. Because we handle the construction and the roofing, we coordinate those inspections within the overall schedule. Our permit guide explains the process.

Getting the details right from day one

The advantage of a new roof is that nothing is hidden. Every layer, from decking to flashing to the finished surface, is installed new and inspected. That is a rare opportunity to build a roof exactly as it should be, and it is why we treat new roof installation with the same care as our roof replacement work.

When you need it

When a new roof installation is the right call.

A new roof installation is part of many projects. These are the situations where we install a roof from the deck up rather than repairing or replacing an existing one.

01

Building a new home

A custom home needs a roof designed with its framing, insulation, ventilation and exterior style.

02

Adding a room

A single-story addition needs its own roof plus a careful tie-in to the existing roof.

03

Adding a second story

Building up usually means a completely new roof over the whole house.

04

Building an ADU or guest house

Detached units need a roof that suits their size, style and drainage.

05

Rebuilding after damage

After fire, storm or structural damage, the roof is rebuilt as part of the repair.

06

Changing the roof shape

Converting a flat roof to a pitched one, or reshaping a roofline, is a new roof installation.

07

Converting a garage or patio

Enclosing space often means upgrading a light roof to a fully waterproof system.

08

Changing material type

Switching to tile or metal can mean new framing, decking and a fully new roofing system.

Replacing a worn roof on an existing home instead? See roof replacement. Comparing materials first? Our roofing materials guide sets them side by side.

What is included

What our new roof installation includes.

A roof is a system of layers. For a new roof installation we build every one of them, starting with the structure that carries it.

Roof replacement in progress showing new decking and underlayment from above

New decking and underlayment going down on an Ocean Seven roof

01

Plan and structural review

We review the roof plan, pitch and framing with the design team, so the structure suits the chosen material.

02

Decking

Structural sheathing is installed and fastened to the specified pattern, giving the roofing a solid, flat base.

03

Underlayment

Underlayment covers the whole deck, with extra protection in valleys, at eaves and around penetrations.

04

Flashing at every transition

Walls, valleys, chimneys, skylights and vents receive new flashing designed for the roofing system.

05

Ventilation

Intake and exhaust vents are planned so the attic or roof assembly can breathe and stay dry.

06

The roofing system

Tile, architectural shingle, standing seam metal or polyurethane foam, installed to the manufacturer’s requirements.

07

Edges, gutters and inspection

Drip edges, gutter connections and final details are completed, and the roof is inspected as part of the permit.

Roofing systems

Choosing the best roof for a new build.

On a new build you are free to choose the roofing system, as long as the structure is designed for it. These are the systems we install.

Mediterranean-style home with a clay tile roof

Long-lasting and suited to Spanish and Mediterranean design. Tile is heavy, so the framing is engineered for it from the start.

Best for: Spanish and Mediterranean homes

Material reference image

Home with a new dark architectural shingle roof and Ocean Seven Builders job sign

Versatile, lighter and available in many colors, shingle suits most pitched roofs on new homes and additions.

Best for: traditional and transitional homes

Ocean Seven project

Modern home with a standing seam metal roof

Clean lines and concealed fasteners for contemporary designs with long, simple roof planes.

Best for: modern architecture

Material reference image

Modern home with a white-coated polyurethane foam roof, aerial view

Seamless foam for flat and low-slope roofs, built up to drain and then coated for protection.

Best for: flat and low-slope roofs

Ocean Seven project

How it works

How a new roof installation runs.

On a new build, the roof follows the framing. These five steps show how it fits into the wider project.

01

Design review

We review the roof plan, pitch, drainage and material with you and the design team.

02

Line-item proposal

The roofing scope is priced separately in the proposal, so you can see exactly what it includes.

03

Permit & framing

The roof is included in the permit drawings, and the framing is built and inspected to suit it.

04

Roof installation

Our crew installs decking, underlayment, flashing and the roofing system, then completes ventilation and edges.

05

Inspection & warranty

The roof is inspected with the project, and you receive the workmanship and manufacturer warranty documents.

Planning your budget

What affects the cost of a new roof installation.

Every new roof is designed for its building, so we price it from the plans. These are the factors that drive the cost.

01

Roof area and pitch

Larger areas and steeper slopes take more material, labor and safety setup.

02

Roof complexity

Valleys, hips, dormers and changes in height add flashing and cutting work.

03

Material choice

Tile, shingle, metal and foam differ in material cost and installation time.

04

Structure required

Heavier systems such as tile need framing designed to carry the load.

05

Tie-ins to an existing roof

Additions need careful connections to the existing roof, sometimes with partial re-roofing.

06

Penetrations and solar

Skylights, vents, chimneys and solar mounts all need proper flashing.

How we price it: new roofs are priced from the approved plans in a fixed, line-item proposal. Our guide to permits explains how the roof fits into plan check and inspections.

Why Ocean Seven

Why homeowners choose our top-rated roof installation team.

A new roof is only as good as its details. These are the reasons homeowners trust us to build it as part of their project.

The Ocean Seven Builders team on a job site
In-houseRoofers and builders
01

Builder and roofer in one

The same company frames the structure and installs the roof, so nothing falls between trades.

02

Roofing is our origin trade

Ocean Seven began as a roofing crew, and roofing remains a core specialty.

03

Careful tie-ins

Where new roofs meet existing ones, transitions are detailed to keep water out for the long term.

04

Licensed, bonded & insured

CSLB License #893048, B-General and C-39 Roofing. You can verify it with the Contractors State License Board.

What clients say

What homeowners say about their projects.

Selected excerpts from public Google and Yelp reviews of Ocean Seven Builders, quoted as written.

Ocean Seven Builders handled both our new roof and a room addition, and it was a big project for us. Ron made the whole thing feel manageable. … The addition took a bit longer, but the end result looks great and feels like it’s always been part of the home.

Patricia Mace

Google review · Roofing + addition

Our home needed a new roof badly, and while we were already remodeling, we decided to update the master bathroom too. Ocean Seven Builders handled both projects and did an incredible job. … the new roof completely changed the appearance of our house.

Crystal Green

Google review · Roofing + bathroom

He was really easy to deal with and explained everything really well. He does not use subs, his people work for him. Ron was also at the job every day and made sure I knew what was going on.

Kenny MacPherson

Google review · Roof replacement

Homeowner guides

Roofing & building guides for homeowners.

Reading before you plan a new roof: choosing the best roofing material, repair or replace, and how permits work.

Aerial view of a completed dark shingle roof with a white low-slope membrane section

Roofing Guides

New Roof Installation: The Layers and Decisions Before You Order Materials

What actually goes into a new shingle roof once a material is chosen: the layers from deck to ridge, and the decisions,

November 10, 2026

Aerial view of a completed dark shingle roof on a single-story house with a white low-slope membrane roof over an attached garage

Roofing Guides

Roof Repair Scope: Checking the Whole Roof Without Over-Scoping the Fix

What a roof repair should actually cover: checking the full roof and the decking at the repair site, not just the reported

November 5, 2026

Roofers installing new wood roof sheathing on a house after the old shingles were torn off

Roofing Guides

Roof Decking During a Re-Roof: When Sheathing Needs Replacing

What happens to the wood deck under your roof during a replacement: how sheathing is inspected after tear-off, when it must be

October 27, 2026

Roofing FAQ

Roofing questions, answered by professionals.

Repair or replace, which material, permits, leaks and warranties: straight answers from a roofing contractor that started as a roofing crew.

How do I know if my roof needs repair or replacement?

Isolated problems, such as a failed flashing or a small damaged area, can usually be repaired. However, when leaks keep returning, the underlayment has reached the end of its life, or the decking is soft in several places, replacement is normally the better long-term value. An inspection tells you which situation you are in. Learn more about roof repair and roof replacement.

We install clay and concrete tile, architectural asphalt shingle, standing seam metal and seamless polyurethane spray foam for flat and low-slope roofs. Each suits a different roof shape and house style, so our guide to the best roof for Los Angeles homes and our page on roofing materials & options compare them.

Polyurethane foam is sprayed on as a liquid, expands into a seamless surface and is then protected with a coating. Because there are no seams to fail, it is well suited to flat and low-slope roofs where water would otherwise collect. It is the company’s roofing specialty.

It depends on the size of the roof, the system, the tear-off and the weather. As a guide, the company’s typical range for a polyurethane foam re-roof is two to five days. Your schedule is confirmed in the proposal after an inspection.

In most Los Angeles-area cities, a roof replacement requires a permit and inspections. We coordinate the permit and inspections as part of the project. Our guide to home improvement permits in Los Angeles explains the process.

Yes. A ceiling stain is not always directly under the leak, because water travels along decking and framing first. We trace the source, which is often flashing, a roof penetration or a valley, and then repair it. See roof leak repair.

Yes. An inspection looks at the roof surface, flashing, penetrations, drainage and, where accessible, the decking and underlayment. It is also the first step before any repair or replacement proposal. See roof inspections.

The company lists insurance claim work as part of its roofing service. We can inspect and document the damage and prepare a scope of repair. Coverage decisions, however, are made by your insurance company.

Damaged decking is replaced before the new roof goes on, because a new roof is only as sound as what it is attached to. The proposal explains how decking replacement is handled so there are no surprises.

Often, yes. Tile is considerably heavier than shingle, though, so the roof framing has to be checked first and may need strengthening. We confirm this before you commit. Learn more about tile roofing and shingle roofing.

Yes. Flat and low-slope roofs are a core part of the company’s roofing work, including seamless polyurethane foam systems. See flat & low-slope roofing.

Every project carries a written workmanship warranty, along with the manufacturer’s warranty on the roofing system. Specific terms and periods are set out in your contract.

Homeowner guides

From the Ocean Seven blog.

Practical guides from a Los Angeles general contractor on roofing, additions, kitchens and permits, so you can plan your project with confidence.

AI-generated design concept of a detailed architectural scale model of a single-story home with a central courtyard, surrounded by landscaping and other study models on a design studio table

New Construction Guides

Design-Build Homes: Who Owns Which Decisions, and How Coordination Works

How decision ownership works under a design-build contract: which calls the homeowner makes, which the design-build team makes, when each needs to

November 15, 2026

AI-generated design concept of a family room addition with a vaulted, beamed ceiling and a tall peaked window bringing daylight in where the new roof ties in higher than the rest of the house

Room Addition Guides

Family Room Additions: Daylight, Roof Tie-Ins and Connecting to the House

How a family room addition's roof ties into the existing roof, how much daylight you can realistically add, and how the new

November 13, 2026

AI-generated before-and-after design concept comparing a dated dark-tile small bathroom with a shower curtain to a renovated version with a light vanity and frameless glass shower

Bathroom Remodeling Guides

Small Bathroom Remodeling: Clearances, Visual Openness and Storage That Works

The clearances a small bathroom layout has to meet, the finish and layout moves that make the room read larger, and how

November 12, 2026

Start your project

Talk with a Los Angeles general contractor.

Tell us roughly what you have in mind. Then we will come out, measure, listen and send a fixed line-item proposal, free and with no pressure attached.

Office

Ocean Seven Builders, Inc.
15155 Stagg St Unit # 2
Van Nuys, CA 91405
Get directions

Hours

Monday–Friday 7:00am–7:00pm
Saturday 8:00am–4:00pm · Sunday closed

License

CSLB #893048 · B-General · C-39 Roofing
Licensed, bonded & insured

Request a consultation

Six quick fields. A sentence or two about the project is plenty.