The New Construction
Process, Step by Step
A clear view of the new construction process at Ocean Seven Builders, from the first consultation and site review through design, permits, construction, inspections and handover, with one team responsible at every stage.
- Licensed & insured · CSLB #893048 · B-General · C-39 Roofing
- One accountable team
- Regular progress updates
Illustrative image
Illustrative image
How we build
The new construction process, explained from start to finish.
Building a new home is a long journey with many steps, and it is natural to wonder what happens next. Knowing the new construction process in advance helps you plan your finances, your decisions and your life around the project. It also helps you recognize a well-run job when you see one.
At Ocean Seven Builders, the process is organized into clear phases: consultation and site review, design and engineering, proposal and permits, construction, and handover. Each phase has its own decisions and milestones, and one team carries responsibility from the first meeting to the final walkthrough. You receive regular updates throughout, so you always know where the project stands.
The steps below describe a typical ground-up home. Every project is different, so the details vary, but the sequence stays the same. For specific stages, see site preparation and foundations and framing and structural construction.
- Clear phases with defined milestones
- One team responsible at every stage
- Regular progress updates
- Inspections scheduled throughout
The process explained
A homeowner’s guide to the new construction process.
Phase one: consultation and site review
Every new home starts with a conversation about goals, budget and timing. Next comes a review of the lot: the survey, zoning, setbacks, access, utilities and, where needed, soils information. This phase answers the most important question early, namely what can realistically be built on this site for this budget. Our planning service supports owners at this stage.
Phase two: design and engineering
Architectural design develops from concept to construction drawings, while structural engineering is coordinated alongside it. During this phase, owners make the biggest decisions: layout, style, structural approach, windows and roofing. With pricing feedback at each step, the design stays aligned with the budget. Owners can choose design-build or work with their own architect through our design coordination service.
Phase three: proposal and permits
When the drawings are ready, we prepare a fixed, line-item proposal and milestone schedule. After approval, the plans are submitted for plan check. The city reviews them and usually returns comments, which the team answers before the permit is issued. Our permit guide describes what to expect. Meanwhile, long-lead items can be ordered so they arrive on time.
Phase four: construction
Construction follows a natural sequence. First, the site is prepared and the foundation is placed after inspection. Then the frame rises and is inspected, and roofing, windows and waterproofing make the house weather-tight. Next, plumbing, electrical and HVAC are roughed in and inspected, followed by insulation and drywall. Finally, cabinetry, tile, flooring, fixtures and paint complete the interior, while exterior finishes and landscape are completed outside. Throughout, we provide regular updates and schedule inspections so the work keeps moving.
Phase five: inspection and handover
As the home nears completion, we prepare a punch list of items to finish or adjust and walk the house with you. The final inspection is completed, systems are explained, and warranty documentation is handed over. That is when the keys change hands and the home becomes yours.
How long the whole process takes
Design and city review vary by project and agency, so their length differs. Once construction begins, the company’s typical range for ground-up homes is eight to fourteen months, depending on size, site and finish level. Our article on how long it takes to build a custom home gives a detailed breakdown.
Related new construction services
Talk with a professional
Get honest advice and a fixed, line-item proposal from a top-rated team.
Your role
What owners decide at each stage.
The builder manages the work, but owners make key decisions along the way. These are the most important ones.
Goals and budget
At the start, you set the priorities and the budget range that guide the design.
Design direction
During design, you approve layouts, elevations and the overall look.
Structure and envelope
Windows, roofing and exterior materials are chosen early because they affect cost and schedule.
Proposal approval
You review and approve the fixed, line-item proposal before construction.
Finish selections
Cabinetry, tile, fixtures and lighting are selected on a planned schedule.
Site walkthroughs
At key milestones, you walk the home with us to review progress.
Change decisions
Any changes are priced and approved in writing before they proceed.
Final walkthrough
At the end, you review the punch list and accept the finished home.
Want the budget side of the process? See construction planning and budgeting and our budget guide.
Stage by stage
The stages of our new construction process.
These are the stages a typical new home moves through, from bare ground to keys.
Illustrative image
Consultation and site review
We discuss your goals and review the lot, survey, zoning and access.
Design and engineering
Architecture and structural engineering are developed with budget feedback.
Proposal and permits
A fixed, line-item proposal is approved, then plans go through plan check to the permit.
Site work and foundation
The site is prepared, utilities are placed and the foundation is poured after inspection.
Framing and envelope
The structure is framed and inspected, then roofing, windows and waterproofing close it in.
Systems and finishes
Plumbing, electrical and HVAC are roughed in and inspected, then interior finishes follow.
Inspection and handover
Final inspection, punch list, walkthrough and warranty documentation.
Milestones
Key milestones you will see.
Each milestone marks a visible step forward. These are four of the moments owners remember most.
The lot is cleared and graded, and the building is staked out.
Best for: the start of construction
Illustrative image
Reinforcement is inspected and the foundation is placed.
Best for: a solid base for the home
Illustrative image
Framing, roofing and windows close the house in.
Best for: interior work can begin
Illustrative image
Cabinetry, tile, flooring and fixtures bring the rooms to life.
Best for: the final stretch
Illustrative image
How it works
The five phases in brief.
A summary of the phases above, with one team responsible for every handoff.
Consultation & site
Goals, budget and the lot are reviewed together.
Design & engineering
Drawings and engineering are developed with pricing feedback.
Proposal & permits
A fixed, line-item proposal, plan check and the permit.
Construction
Site work, structure, envelope, systems and finishes with inspections.
Handover
Final inspection, walkthrough and warranty documentation.
Timeline drivers
What affects how long the process takes.
Every phase has its own variables. These are the factors that most affect the overall timeline.
Design decisions
Faster decisions during design keep the drawings moving.
City review
Plan check timing varies by agency and by the number of comments.
Site conditions
Slopes, soils and demolition add time to early stages.
Long-lead items
Windows, specialty fixtures and materials can control the schedule.
Weather
Rain can pause site work and roofing until the house is closed in.
Changes during construction
Late changes add time for redesign, pricing and materials.
Typical range: once building begins, the company’s typical range for ground-up construction is eight to fourteen months. Our timeline guide explains each phase.
Why Ocean Seven
Why owners trust our building process.
A clear process reduces stress for everyone. These are the reasons owners value ours.
Clear phases
You always know what stage the project is in and what comes next.
Regular updates
Progress, decisions and upcoming milestones are communicated regularly.
Written changes
Every change is priced and approved before work proceeds.
Licensed, bonded & insured
CSLB License #893048, B-General and C-39 Roofing. You can verify it with the Contractors State License Board.
What clients say
What clients say about the process.
Selected excerpts from public Google and Yelp reviews of Ocean Seven Builders, quoted as written.
What stood out most was communication. Ron kept us updated throughout the whole kitchen renovation so we never felt out of the loop. … There were no major surprises, and everything stayed pretty close to the original timeline.
Michael Minkler
Google review · Kitchen remodel
Ocean Seven Buiilders, Inc helped me build my back guest house just as I had pictured it. They built my plans with the Engineering. They managed everything I did not have to worry about any permits any drawings.
Cindy M.
Yelp review · Guest house
Ocean Seven Builders handled both projects and did an incredible job. Ron coordinated everything so well that we never felt overwhelmed even with two major projects happening together.
Crystal Green
Google review · Roofing + bathroom
Homeowner guides
New construction guides for homeowners.
Reading to understand each phase: timelines, budgets, delivery methods and permits.
New Construction Guides
November 15, 2026
New Construction Guides
November 9, 2026
New Construction Guides
November 4, 2026
New construction FAQ
New construction questions, answered by professionals.
Custom homes, design-build, budgets, permits and timelines: what to expect when you build from the ground up.
Do you build custom homes in Los Angeles?
Yes. We build custom homes from the ground up, from site preparation and foundations through framing, envelope and finishes. See custom home construction and ground-up residential construction.
Can you work with my architect or existing plans?
Yes. We can build from your architect’s plans, or coordinate architectural design and structural engineering for you. Either way, we review the plans for buildability and budget before construction. See architectural design coordination.
What is design-build?
Design-build means one team is responsible for both the design and the construction. As a result, cost and constructability are considered while the home is being designed, rather than after the drawings are finished. See design-build homes.
How long does new home construction take?
It depends on size, complexity, site conditions and city review. As a guide, the company’s typical range for ground-up new construction is eight to fourteen months. Your schedule is set out in the proposal.
Do you handle permits and inspections?
Yes. Plans, structural engineering and city permits are coordinated in-house from concept through final inspection. Because requirements and review times vary by city, no contractor can promise an approval date. Our guide to home improvement permits in Los Angeles explains the stages.
What happens before construction starts?
We evaluate the site, review the survey and any required reports, confirm feasibility and setbacks, and develop the budget. In addition, utilities, access and drainage are planned before work begins. See site preparation & foundations.
How do you set a construction budget?
We prepare a fixed, line-item proposal. Materials, milestones and allowances are listed separately, so you can see what is firm and which figures depend on your selections. See construction planning & budgeting.
Who does the framing?
Our framers are employed directly rather than subcontracted, so the crew that frames your home works for us. Foundations and structural elements are built to the engineered plans. See framing & structural construction.
Do you build modern and luxury homes?
Yes. We build a range of architectural styles, including modern homes with large glazing and open plans, as well as luxury homes with detailed finishes. See modern home construction and luxury home construction.
Can you demolish an existing house and rebuild?
Yes. Many ground-up projects on established lots start with demolition, which usually needs its own permit. We plan demolition as part of the overall project schedule.
How involved will I be during construction?
You get weekly progress updates, and a principal is on site for walkthroughs and milestones. Decisions about selections are made early, so construction is not held up waiting for choices. See new construction process.
What warranty comes with a new home?
Every project carries a written workmanship warranty, plus manufacturer warranties on installed products such as roofing, windows and finishes. Specific terms are set out in your contract.
Where we work
Service areas across Los Angeles & beyond.
As a Los Angeles general contractor based in Van Nuys, we serve homeowners across Los Angeles County, Orange County, San Bernardino County and Marin County.
Los Angeles County
- Agoura Hills
- Alhambra
- Altadena
- Arleta
- Bel Air
- Beverly Glen
- Beverly Hills
- Brentwood
- Burbank
- Calabasas
- Canoga Park
- Cerritos
- Eagle Rock
- Encino
- Glendale
- Hawthorne
- Hidden Hills
- Highland Park
- Hollywood
- La Cañada Flintridge
- Lake Balboa
- Lakewood
- Malibu
- Manhattan Beach
- Marina del Rey
- Mission Hills
- Monrovia
- Newhall
- North Hollywood
- Panorama City
- Pasadena
- Redondo Beach
- Reseda
- San Gabriel
- Santa Monica
- Sherman Oaks
- Sierra Madre
- South Pasadena
- Studio City
- Tarzana
- Valley Glen
- Valley Village
- Van Nuys
- Venice
- West Hollywood
- Winnetka
- Woodland Hills
Orange County
San Bernardino County
Marin County
Ventura County
Riverside County
One office, not a network of branches. Everything runs out of 15155 Stagg St Unit # 2, Van Nuys, CA 91405. These are the areas our crews travel to; there is no branch office in any of them.
Homeowner guides
From the Ocean Seven blog.
Practical guides from a Los Angeles general contractor on roofing, additions, kitchens and permits, so you can plan your project with confidence.
New Construction Guides
November 15, 2026
Room Addition Guides
November 13, 2026
Bathroom Remodeling Guides
November 12, 2026
Start your project
Talk with a Los Angeles general contractor.
Tell us roughly what you have in mind. Then we will come out, measure, listen and send a fixed line-item proposal, free and with no pressure attached.
Phone
Office
Ocean Seven Builders, Inc.
15155 Stagg St Unit # 2
Van Nuys, CA 91405
Get directions
Hours
Monday–Friday 7:00am–7:00pm
Saturday 8:00am–4:00pm · Sunday closed
License
CSLB #893048 · B-General · C-39 Roofing
Licensed, bonded & insured
Request a consultation
Six quick fields. A sentence or two about the project is plenty.