How we build

The new construction process, explained from start to finish.

Building a new home is a long journey with many steps, and it is natural to wonder what happens next. Knowing the new construction process in advance helps you plan your finances, your decisions and your life around the project. It also helps you recognize a well-run job when you see one.

At Ocean Seven Builders, the process is organized into clear phases: consultation and site review, design and engineering, proposal and permits, construction, and handover. Each phase has its own decisions and milestones, and one team carries responsibility from the first meeting to the final walkthrough. You receive regular updates throughout, so you always know where the project stands.

The steps below describe a typical ground-up home. Every project is different, so the details vary, but the sequence stays the same. For specific stages, see site preparation and foundations and framing and structural construction.

The process explained

A homeowner’s guide to the new construction process.

Phase one: consultation and site review

Every new home starts with a conversation about goals, budget and timing. Next comes a review of the lot: the survey, zoning, setbacks, access, utilities and, where needed, soils information. This phase answers the most important question early, namely what can realistically be built on this site for this budget. Our planning service supports owners at this stage.

Phase two: design and engineering

Architectural design develops from concept to construction drawings, while structural engineering is coordinated alongside it. During this phase, owners make the biggest decisions: layout, style, structural approach, windows and roofing. With pricing feedback at each step, the design stays aligned with the budget. Owners can choose design-build or work with their own architect through our design coordination service.

Phase three: proposal and permits

When the drawings are ready, we prepare a fixed, line-item proposal and milestone schedule. After approval, the plans are submitted for plan check. The city reviews them and usually returns comments, which the team answers before the permit is issued. Our permit guide describes what to expect. Meanwhile, long-lead items can be ordered so they arrive on time.

Phase four: construction

Construction follows a natural sequence. First, the site is prepared and the foundation is placed after inspection. Then the frame rises and is inspected, and roofing, windows and waterproofing make the house weather-tight. Next, plumbing, electrical and HVAC are roughed in and inspected, followed by insulation and drywall. Finally, cabinetry, tile, flooring, fixtures and paint complete the interior, while exterior finishes and landscape are completed outside. Throughout, we provide regular updates and schedule inspections so the work keeps moving.

Phase five: inspection and handover

As the home nears completion, we prepare a punch list of items to finish or adjust and walk the house with you. The final inspection is completed, systems are explained, and warranty documentation is handed over. That is when the keys change hands and the home becomes yours.

How long the whole process takes

Design and city review vary by project and agency, so their length differs. Once construction begins, the company’s typical range for ground-up homes is eight to fourteen months, depending on size, site and finish level. Our article on how long it takes to build a custom home gives a detailed breakdown.

Your role

What owners decide at each stage.

The builder manages the work, but owners make key decisions along the way. These are the most important ones.

01

Goals and budget

At the start, you set the priorities and the budget range that guide the design.

02

Design direction

During design, you approve layouts, elevations and the overall look.

03

Structure and envelope

Windows, roofing and exterior materials are chosen early because they affect cost and schedule.

04

Proposal approval

You review and approve the fixed, line-item proposal before construction.

05

Finish selections

Cabinetry, tile, fixtures and lighting are selected on a planned schedule.

06

Site walkthroughs

At key milestones, you walk the home with us to review progress.

07

Change decisions

Any changes are priced and approved in writing before they proceed.

08

Final walkthrough

At the end, you review the punch list and accept the finished home.

Want the budget side of the process? See construction planning and budgeting and our budget guide.

Stage by stage

The stages of our new construction process.

These are the stages a typical new home moves through, from bare ground to keys.

Illustrative image: framing process stage

Illustrative image

01

Consultation and site review

We discuss your goals and review the lot, survey, zoning and access.

02

Design and engineering

Architecture and structural engineering are developed with budget feedback.

03

Proposal and permits

A fixed, line-item proposal is approved, then plans go through plan check to the permit.

04

Site work and foundation

The site is prepared, utilities are placed and the foundation is poured after inspection.

05

Framing and envelope

The structure is framed and inspected, then roofing, windows and waterproofing close it in.

06

Systems and finishes

Plumbing, electrical and HVAC are roughed in and inspected, then interior finishes follow.

07

Inspection and handover

Final inspection, punch list, walkthrough and warranty documentation.

Milestones

Key milestones you will see.

Each milestone marks a visible step forward. These are four of the moments owners remember most.

Illustrative image: prepared site process stage

The lot is cleared and graded, and the building is staked out.

Best for: the start of construction

Illustrative image

Illustrative image: foundation process stage

Reinforcement is inspected and the foundation is placed.

Best for: a solid base for the home

Illustrative image

Illustrative image: enclosure process stage

Framing, roofing and windows close the house in.

Best for: interior work can begin

Illustrative image

Illustrative image: interior finishes process stage

Cabinetry, tile, flooring and fixtures bring the rooms to life.

Best for: the final stretch

Illustrative image

How it works

The five phases in brief.

A summary of the phases above, with one team responsible for every handoff.

01

Consultation & site

Goals, budget and the lot are reviewed together.

02

Design & engineering

Drawings and engineering are developed with pricing feedback.

03

Proposal & permits

A fixed, line-item proposal, plan check and the permit.

04

Construction

Site work, structure, envelope, systems and finishes with inspections.

05

Handover

Final inspection, walkthrough and warranty documentation.

Timeline drivers

What affects how long the process takes.

Every phase has its own variables. These are the factors that most affect the overall timeline.

01

Design decisions

Faster decisions during design keep the drawings moving.

02

City review

Plan check timing varies by agency and by the number of comments.

03

Site conditions

Slopes, soils and demolition add time to early stages.

04

Long-lead items

Windows, specialty fixtures and materials can control the schedule.

05

Weather

Rain can pause site work and roofing until the house is closed in.

06

Changes during construction

Late changes add time for redesign, pricing and materials.

Typical range: once building begins, the company’s typical range for ground-up construction is eight to fourteen months. Our timeline guide explains each phase.

Why Ocean Seven

Why owners trust our building process.

A clear process reduces stress for everyone. These are the reasons owners value ours.

The Ocean Seven Builders team on a job site
One teamConsultation to keys
01

Clear phases

You always know what stage the project is in and what comes next.

02

Regular updates

Progress, decisions and upcoming milestones are communicated regularly.

03

Written changes

Every change is priced and approved before work proceeds.

04

Licensed, bonded & insured

CSLB License #893048, B-General and C-39 Roofing. You can verify it with the Contractors State License Board.

What clients say

What clients say about the process.

Selected excerpts from public Google and Yelp reviews of Ocean Seven Builders, quoted as written.

What stood out most was communication. Ron kept us updated throughout the whole kitchen renovation so we never felt out of the loop. … There were no major surprises, and everything stayed pretty close to the original timeline.

Michael Minkler

Google review · Kitchen remodel

Ocean Seven Buiilders, Inc helped me build my back guest house just as I had pictured it. They built my plans with the Engineering. They managed everything I did not have to worry about any permits any drawings.

Cindy M.

Yelp review · Guest house

Ocean Seven Builders handled both projects and did an incredible job. Ron coordinated everything so well that we never felt overwhelmed even with two major projects happening together.

Crystal Green

Google review · Roofing + bathroom

Homeowner guides

New construction guides for homeowners.

Reading to understand each phase: timelines, budgets, delivery methods and permits.

AI-generated design concept of a detailed architectural scale model of a single-story home with a central courtyard, surrounded by landscaping and other study models on a design studio table

New Construction Guides

Design-Build Homes: Who Owns Which Decisions, and How Coordination Works

How decision ownership works under a design-build contract: which calls the homeowner makes, which the design-build team makes, when each needs to

November 15, 2026

AI-generated design concept of a newly completed single-story modern home with a tile roof, wood garage door and drought-tolerant front landscaping

New Construction Guides

Ground-Up Residential Construction: From Site Feasibility to Final Inspection

How a ground-up home actually comes together: site feasibility and soils work, foundation, framing, the weather-tight shell, and the inspections that carry

November 9, 2026

AI-generated design concept of a custom two-story hillside home with cream stucco and stone accents, a wood front door and olive trees along a landscaped driveway at golden hour

New Construction Guides

Custom Home Construction: Turning a Brief Into a Buildable Scope

How a homeowner's brief becomes a buildable scope for a custom home: the stages from written brief to permit-ready plans, where budget

November 4, 2026

New construction FAQ

New construction questions, answered by professionals.

Custom homes, design-build, budgets, permits and timelines: what to expect when you build from the ground up.

Do you build custom homes in Los Angeles?

Yes. We build custom homes from the ground up, from site preparation and foundations through framing, envelope and finishes. See custom home construction and ground-up residential construction.

Yes. We can build from your architect’s plans, or coordinate architectural design and structural engineering for you. Either way, we review the plans for buildability and budget before construction. See architectural design coordination.

Design-build means one team is responsible for both the design and the construction. As a result, cost and constructability are considered while the home is being designed, rather than after the drawings are finished. See design-build homes.

It depends on size, complexity, site conditions and city review. As a guide, the company’s typical range for ground-up new construction is eight to fourteen months. Your schedule is set out in the proposal.

Yes. Plans, structural engineering and city permits are coordinated in-house from concept through final inspection. Because requirements and review times vary by city, no contractor can promise an approval date. Our guide to home improvement permits in Los Angeles explains the stages.

We evaluate the site, review the survey and any required reports, confirm feasibility and setbacks, and develop the budget. In addition, utilities, access and drainage are planned before work begins. See site preparation & foundations.

We prepare a fixed, line-item proposal. Materials, milestones and allowances are listed separately, so you can see what is firm and which figures depend on your selections. See construction planning & budgeting.

Our framers are employed directly rather than subcontracted, so the crew that frames your home works for us. Foundations and structural elements are built to the engineered plans. See framing & structural construction.

Yes. We build a range of architectural styles, including modern homes with large glazing and open plans, as well as luxury homes with detailed finishes. See modern home construction and luxury home construction.

Yes. Many ground-up projects on established lots start with demolition, which usually needs its own permit. We plan demolition as part of the overall project schedule.

You get weekly progress updates, and a principal is on site for walkthroughs and milestones. Decisions about selections are made early, so construction is not held up waiting for choices. See new construction process.

Every project carries a written workmanship warranty, plus manufacturer warranties on installed products such as roofing, windows and finishes. Specific terms are set out in your contract.

Homeowner guides

From the Ocean Seven blog.

Practical guides from a Los Angeles general contractor on roofing, additions, kitchens and permits, so you can plan your project with confidence.

AI-generated design concept of a detailed architectural scale model of a single-story home with a central courtyard, surrounded by landscaping and other study models on a design studio table

New Construction Guides

Design-Build Homes: Who Owns Which Decisions, and How Coordination Works

How decision ownership works under a design-build contract: which calls the homeowner makes, which the design-build team makes, when each needs to

November 15, 2026

AI-generated design concept of a family room addition with a vaulted, beamed ceiling and a tall peaked window bringing daylight in where the new roof ties in higher than the rest of the house

Room Addition Guides

Family Room Additions: Daylight, Roof Tie-Ins and Connecting to the House

How a family room addition's roof ties into the existing roof, how much daylight you can realistically add, and how the new

November 13, 2026

AI-generated before-and-after design concept comparing a dated dark-tile small bathroom with a shower curtain to a renovated version with a light vanity and frameless glass shower

Bathroom Remodeling Guides

Small Bathroom Remodeling: Clearances, Visual Openness and Storage That Works

The clearances a small bathroom layout has to meet, the finish and layout moves that make the room read larger, and how

November 12, 2026

Start your project

Talk with a Los Angeles general contractor.

Tell us roughly what you have in mind. Then we will come out, measure, listen and send a fixed line-item proposal, free and with no pressure attached.

Office

Ocean Seven Builders, Inc.
15155 Stagg St Unit # 2
Van Nuys, CA 91405
Get directions

Hours

Monday–Friday 7:00am–7:00pm
Saturday 8:00am–4:00pm · Sunday closed

License

CSLB #893048 · B-General · C-39 Roofing
Licensed, bonded & insured

Request a consultation

Six quick fields. A sentence or two about the project is plenty.