- Home
- Room Addition
- Second-Story Additions
Top-rated addition contractor · 4.9 on Google
Professional Second-Story
Additions
Ocean Seven Builders designs and builds professional second-story additions that add bedrooms, suites and living space without giving up the yard. The existing structure is evaluated first, and the new floor and roof are built by our own crews.
- Licensed & insured · CSLB #893048 · B-General · C-39 Roofing
- Roofing & framing in-house
- Structure evaluated first
Illustrative image
Illustrative image
Build up, keep the yard
A second-story addition that doubles your space on the same footprint.
When a lot is small or the yard is too valuable to give up, the only way to add significant space is up. A second-story addition can add several bedrooms, a primary suite, a family loft or an office, often doubling the living area of a single-story home without reducing the garden at all.
It is also the most structurally demanding type of addition. The existing walls and foundation were designed to carry a single story and a roof, not a whole new floor. Therefore, every second-story addition starts with a structural evaluation. An engineer reviews the existing foundation and framing, and the design specifies any upgrades, such as new footings, posts or shear walls, needed to carry the new level. In most cases, the existing roof is removed and a new roof is built above the upper floor.
Because Ocean Seven began as a roofing company and employs its own framing crews, we handle the two hardest parts of a second story, the structure and the new roof, ourselves. Our guide to single-story vs. second-story additions explains when building up makes the most sense.
- Full and partial second stories
- Existing foundation and framing evaluated first
- New stairs placed to suit the floor plan
- New roof built by our own roofing crews
Second stories explained
A homeowner’s guide to second-story additions.
Can my house carry a second story?
This is the first question for any second-story addition. Single-story homes were designed for the weight of one floor and a roof. Adding a full story increases the loads on the walls and foundation, and it changes how the house resists earthquakes and wind. An engineer evaluates the existing foundation and framing and specifies upgrades where needed. Sometimes these are modest; sometimes new footings, posts and shear walls are required. Either way, the answer comes before design goes too far.
Where the stair goes
A new stair takes floor space on the ground level, and its position shapes both floors. Ideally it rises from a central hall or living area, arriving upstairs near the bedrooms without crossing living spaces. Finding that position early is one of the most important design decisions. In smaller homes, the stair may replace a closet, part of a bedroom or a corner of the living room.
Full or partial second story?
A full second story covers the whole footprint and adds the most space. A partial second story covers only part of the house, such as a suite above the living room or garage, which reduces structural work and can suit zoning limits or neighborhood character. The right choice depends on how much space you need, the budget and local rules.
The roof comes off
In most second-story additions, the existing roof is removed over the area being built up, and a new roof is built above the upper floor. That means the house is temporarily open. Careful scheduling, weather protection and fast framing keep that period short. Because Ocean Seven began as a roofing company, the new roof, and how it meets any remaining lower roofs, is built with real expertise.
Living at home or moving out
Some families stay at home during a second-story addition, while others move out for part of the project, especially when the roof is open or utilities are interrupted. We discuss this during planning, so you can make arrangements in advance. Our planning service helps set realistic expectations.
Permits and neighbors
Second stories receive more review than single-story additions, including height limits, setbacks and sometimes design guidelines. Neighbors may also be notified in some areas. We coordinate plan check and inspections as part of the project, and our permit guide explains the general process.
Related room addition services
Talk with a professional
Get honest advice and a fixed, line-item proposal from a top-rated team.
Is it right for you?
When building up makes the most sense.
A second story is a major project. These are the situations where it is often the best way to add space.
A small lot
There is little or no room to build out within the setbacks.
A yard you love
The garden, pool or play space is too valuable to give up.
Several rooms needed
A second story can add multiple bedrooms and bathrooms at once.
Views above the street
An upper floor can capture views a single story cannot.
Separating sleeping and living
Bedrooms upstairs create quieter, more private sleeping areas.
Lot coverage limits
Zoning may allow more floor area without more footprint.
An aging roof
If the roof needs replacing anyway, building up becomes more attractive.
Staying long term
A second story transforms a home for many years of family life.
Prefer to build out? See single-story additions. Unsure which works for your lot? Start with addition design and planning.
What we deliver
What our second-story additions include.
A second story touches almost every part of the house. These are the stages we manage on every project.
Illustrative image
Structural evaluation
An engineer reviews the existing foundation and framing to determine required upgrades.
Design and stair planning
The upper floor layout and the stair location are planned to suit both levels.
Permits
Structural, energy and plan check requirements are coordinated through to the permit.
Foundation and structural upgrades
New footings, posts, beams and shear walls are installed where required.
Upper floor framing
The new floor system, walls and roof structure are framed by our crews.
New roof and envelope
A new roof, windows and exterior finishes make the upper level weather-tight.
Systems, finishes and walkthrough
Plumbing, electrical, HVAC and finishes are completed, followed by final inspection.
Popular types
Second stories in different forms.
Building up can mean a whole new floor or a smaller upper section. These are four common approaches.
A complete upper floor over the whole house, often with several bedrooms and baths.
Best for: growing families
Illustrative before-and-after concept
An upper level over part of the house, such as a suite above the garage or living room.
Best for: targeted extra space
Illustrative before-and-after concept
New bedrooms upstairs with views, separated from living spaces below.
Best for: quiet sleeping areas
Illustrative image
An open upper landing or loft that serves as a second living area.
Best for: play and relaxation
Illustrative image
How it works
How a second-story addition runs.
Five steps from the structural evaluation to the final walkthrough, with one team responsible throughout.
Evaluation
We review the house and an engineer evaluates the existing structure.
Design & engineering
The upper floor, stair and structural upgrades are designed.
Proposal & permits
A fixed, line-item proposal, followed by plan check and the permit.
Construction
Structural upgrades, upper floor framing, new roof, systems and finishes.
Final walkthrough
Final inspection, punch list and warranty documentation.
Planning your budget
What affects the cost of a second-story addition.
Second stories involve the most structural work of any addition. These are the main cost drivers.
Structural upgrades
New footings, beams and shear walls depend on the existing structure.
Size of the upper floor
A full second story costs more than a partial one.
New roof
The existing roof is usually removed and a new one built above.
Stair location
Fitting a stair may require reworking part of the ground floor.
Bathrooms upstairs
Plumbing must run up through the existing house.
Temporary relocation
Some projects require the family to move out during key stages.
How we price it: a fixed, line-item proposal after the structural evaluation, with structure, roof, systems and finishes listed separately.
Why Ocean Seven
Why homeowners choose our top-rated addition team.
Building up depends on structure and roofing. These are the reasons homeowners trust us with both.
Structure evaluated first
We never design a second story before the existing house has been reviewed.
Roofing is our origin trade
The new roof is built by a team that started in roofing.
Our own framing crews
The upper floor is framed by people who work for us.
Licensed, bonded & insured
CSLB License #893048, B-General and C-39 Roofing. You can verify it with the Contractors State License Board.
What clients say
What homeowners say about their projects.
Selected excerpts from public Google and Yelp reviews of Ocean Seven Builders, quoted as written.
Ocean Seven Builders handled both our new roof and a room addition, and it was a big project for us. Ron made the whole thing feel manageable. … The addition took a bit longer, but the end result looks great and feels like it’s always been part of the home.
Patricia Mace
Google review · Roofing + addition
He was really easy to deal with and explained everything really well. He does not use subs, his people work for him. Ron was also at the job every day and made sure I knew what was going on.
Kenny MacPherson
Google review · Roof replacement
Super happy we went with Ocean Seven Builders for our addition project. … The extra room completely changed our home and gave us the space we badly needed!
Noah Lopez
Google review · Room addition
Homeowner guides
Room addition guides for homeowners.
Reading for anyone thinking of building up: single vs. second story, suites and permits.
Room Addition Guides
November 13, 2026
Room Addition Guides
November 8, 2026
Room Addition Guides
October 30, 2026
Room additions FAQ
Room addition questions, answered by professionals.
Building out or up, structure, permits, cost drivers and living through construction: what to know before you add space.
Should I build a single-story or second-story addition?
It depends on your lot, your existing structure and how you want to live during construction. Building out uses yard space, while building up preserves it but requires the existing house to carry a second floor. Our single-story vs. second-story addition guide compares both, and you can also explore single-story additions and second-story additions.
Can my house support a second story?
Not always without changes. A structural evaluation of the existing foundation and framing is essential, and in many cases they need strengthening first. We measure the house and coordinate structural engineering before the design is finalized.
Do room additions need permits?
Yes. Additions require plans, structural engineering where load is involved, plan check and inspections. We coordinate this in-house. Our guide to home improvement permits in Los Angeles explains each stage.
How long does a room addition take?
Timelines depend heavily on scope, structure and city review, so we set the schedule at the estimate rather than quoting a generic figure. The proposal lays out the milestones.
Can we live in the house during construction?
With a single-story addition, families can often stay in most of the house. A second story usually involves opening the roof, so some families plan to move out for part of the project. We discuss this early because it affects your budget.
What kinds of additions do you build?
How do you make the addition match the existing house?
We match rooflines, window proportions, exterior finishes and interior floor levels, so the addition looks like it was always there. That is why design and planning matter as much as construction.
How do setbacks and lot coverage affect my addition?
Each city sets limits on how close you can build to property lines and how much of the lot can be covered. A site survey early in the process shows how much room you actually have to build out.
Can the addition include a bathroom or kitchen?
Yes. Adding a bathroom or extending a kitchen means planning plumbing, drainage, ventilation and electrical as part of the design. We coordinate these from the start.
Do you handle design and plans for additions?
Yes. Layout studies, architectural drawings and structural engineering are coordinated in-house, so you work with one team. See addition design & planning.
How is a room addition priced?
We provide a fixed, line-item proposal. The main cost drivers are the foundation, structural work, the roof tie-in or new roof, utilities and the finishes you select.
Will I need a new roof?
A single-story addition needs a carefully detailed tie-in to the existing roof. A second-story addition usually means a new roof over the whole house, which makes it a good time to review roofing options.
Where we work
Service areas across Los Angeles & beyond.
As a Los Angeles general contractor based in Van Nuys, we serve homeowners across Los Angeles County, Orange County, San Bernardino County and Marin County.
Los Angeles County
- Agoura Hills
- Alhambra
- Altadena
- Arleta
- Bel Air
- Beverly Glen
- Beverly Hills
- Brentwood
- Burbank
- Calabasas
- Canoga Park
- Cerritos
- Eagle Rock
- Encino
- Glendale
- Hawthorne
- Hidden Hills
- Highland Park
- Hollywood
- La Cañada Flintridge
- Lake Balboa
- Lakewood
- Malibu
- Manhattan Beach
- Marina del Rey
- Mission Hills
- Monrovia
- Newhall
- North Hollywood
- Panorama City
- Pasadena
- Redondo Beach
- Reseda
- San Gabriel
- Santa Monica
- Sherman Oaks
- Sierra Madre
- South Pasadena
- Studio City
- Tarzana
- Valley Glen
- Valley Village
- Van Nuys
- Venice
- West Hollywood
- Winnetka
- Woodland Hills
Orange County
San Bernardino County
Marin County
Ventura County
Riverside County
One office, not a network of branches. Everything runs out of 15155 Stagg St Unit # 2, Van Nuys, CA 91405. These are the areas our crews travel to; there is no branch office in any of them.
Homeowner guides
From the Ocean Seven blog.
Practical guides from a Los Angeles general contractor on roofing, additions, kitchens and permits, so you can plan your project with confidence.
New Construction Guides
November 15, 2026
Room Addition Guides
November 13, 2026
Bathroom Remodeling Guides
November 12, 2026
Start your project
Talk with a Los Angeles general contractor.
Tell us roughly what you have in mind. Then we will come out, measure, listen and send a fixed line-item proposal, free and with no pressure attached.
Phone
Office
Ocean Seven Builders, Inc.
15155 Stagg St Unit # 2
Van Nuys, CA 91405
Get directions
Hours
Monday–Friday 7:00am–7:00pm
Saturday 8:00am–4:00pm · Sunday closed
License
CSLB #893048 · B-General · C-39 Roofing
Licensed, bonded & insured
Request a consultation
Six quick fields. A sentence or two about the project is plenty.