Top-rated addition contractor · 4.9 on Google

Professional Second-Story
Additions

Ocean Seven Builders designs and builds professional second-story additions that add bedrooms, suites and living space without giving up the yard. The existing structure is evaluated first, and the new floor and roof are built by our own crews.

Illustrative image

Illustrative image: two story transformation exterior

Illustrative image

Build up, keep the yard

A second-story addition that doubles your space on the same footprint.

When a lot is small or the yard is too valuable to give up, the only way to add significant space is up. A second-story addition can add several bedrooms, a primary suite, a family loft or an office, often doubling the living area of a single-story home without reducing the garden at all.

It is also the most structurally demanding type of addition. The existing walls and foundation were designed to carry a single story and a roof, not a whole new floor. Therefore, every second-story addition starts with a structural evaluation. An engineer reviews the existing foundation and framing, and the design specifies any upgrades, such as new footings, posts or shear walls, needed to carry the new level. In most cases, the existing roof is removed and a new roof is built above the upper floor.

Because Ocean Seven began as a roofing company and employs its own framing crews, we handle the two hardest parts of a second story, the structure and the new roof, ourselves. Our guide to single-story vs. second-story additions explains when building up makes the most sense.

Second stories explained

A homeowner’s guide to second-story additions.

Can my house carry a second story?

This is the first question for any second-story addition. Single-story homes were designed for the weight of one floor and a roof. Adding a full story increases the loads on the walls and foundation, and it changes how the house resists earthquakes and wind. An engineer evaluates the existing foundation and framing and specifies upgrades where needed. Sometimes these are modest; sometimes new footings, posts and shear walls are required. Either way, the answer comes before design goes too far.

Where the stair goes

A new stair takes floor space on the ground level, and its position shapes both floors. Ideally it rises from a central hall or living area, arriving upstairs near the bedrooms without crossing living spaces. Finding that position early is one of the most important design decisions. In smaller homes, the stair may replace a closet, part of a bedroom or a corner of the living room.

Full or partial second story?

A full second story covers the whole footprint and adds the most space. A partial second story covers only part of the house, such as a suite above the living room or garage, which reduces structural work and can suit zoning limits or neighborhood character. The right choice depends on how much space you need, the budget and local rules.

The roof comes off

In most second-story additions, the existing roof is removed over the area being built up, and a new roof is built above the upper floor. That means the house is temporarily open. Careful scheduling, weather protection and fast framing keep that period short. Because Ocean Seven began as a roofing company, the new roof, and how it meets any remaining lower roofs, is built with real expertise.

Living at home or moving out

Some families stay at home during a second-story addition, while others move out for part of the project, especially when the roof is open or utilities are interrupted. We discuss this during planning, so you can make arrangements in advance. Our planning service helps set realistic expectations.

Permits and neighbors

Second stories receive more review than single-story additions, including height limits, setbacks and sometimes design guidelines. Neighbors may also be notified in some areas. We coordinate plan check and inspections as part of the project, and our permit guide explains the general process.

Is it right for you?

When building up makes the most sense.

A second story is a major project. These are the situations where it is often the best way to add space.

01

A small lot

There is little or no room to build out within the setbacks.

02

A yard you love

The garden, pool or play space is too valuable to give up.

03

Several rooms needed

A second story can add multiple bedrooms and bathrooms at once.

04

Views above the street

An upper floor can capture views a single story cannot.

05

Separating sleeping and living

Bedrooms upstairs create quieter, more private sleeping areas.

06

Lot coverage limits

Zoning may allow more floor area without more footprint.

07

An aging roof

If the roof needs replacing anyway, building up becomes more attractive.

08

Staying long term

A second story transforms a home for many years of family life.

Prefer to build out? See single-story additions. Unsure which works for your lot? Start with addition design and planning.

What we deliver

What our second-story additions include.

A second story touches almost every part of the house. These are the stages we manage on every project.

Illustrative image: second story addition landing

Illustrative image

01

Structural evaluation

An engineer reviews the existing foundation and framing to determine required upgrades.

02

Design and stair planning

The upper floor layout and the stair location are planned to suit both levels.

03

Permits

Structural, energy and plan check requirements are coordinated through to the permit.

04

Foundation and structural upgrades

New footings, posts, beams and shear walls are installed where required.

05

Upper floor framing

The new floor system, walls and roof structure are framed by our crews.

06

New roof and envelope

A new roof, windows and exterior finishes make the upper level weather-tight.

07

Systems, finishes and walkthrough

Plumbing, electrical, HVAC and finishes are completed, followed by final inspection.

Popular types

Second stories in different forms.

Building up can mean a whole new floor or a smaller upper section. These are four common approaches.

Illustrative before-and-after concept: full second story addition

A complete upper floor over the whole house, often with several bedrooms and baths.

Best for: growing families

Illustrative before-and-after concept

Illustrative before-and-after concept: partial second story addition

An upper level over part of the house, such as a suite above the garage or living room.

Best for: targeted extra space

Illustrative before-and-after concept

Illustrative image: second story bedroom addition

New bedrooms upstairs with views, separated from living spaces below.

Best for: quiet sleeping areas

Illustrative image

Illustrative image: second story family loft

An open upper landing or loft that serves as a second living area.

Best for: play and relaxation

Illustrative image

How it works

How a second-story addition runs.

Five steps from the structural evaluation to the final walkthrough, with one team responsible throughout.

01

Evaluation

We review the house and an engineer evaluates the existing structure.

02

Design & engineering

The upper floor, stair and structural upgrades are designed.

03

Proposal & permits

A fixed, line-item proposal, followed by plan check and the permit.

04

Construction

Structural upgrades, upper floor framing, new roof, systems and finishes.

05

Final walkthrough

Final inspection, punch list and warranty documentation.

Planning your budget

What affects the cost of a second-story addition.

Second stories involve the most structural work of any addition. These are the main cost drivers.

01

Structural upgrades

New footings, beams and shear walls depend on the existing structure.

02

Size of the upper floor

A full second story costs more than a partial one.

03

New roof

The existing roof is usually removed and a new one built above.

04

Stair location

Fitting a stair may require reworking part of the ground floor.

05

Bathrooms upstairs

Plumbing must run up through the existing house.

06

Temporary relocation

Some projects require the family to move out during key stages.

How we price it: a fixed, line-item proposal after the structural evaluation, with structure, roof, systems and finishes listed separately.

Why Ocean Seven

Why homeowners choose our top-rated addition team.

Building up depends on structure and roofing. These are the reasons homeowners trust us with both.

The Ocean Seven Builders team on a job site
In-houseFramers & roofers on payroll
01

Structure evaluated first

We never design a second story before the existing house has been reviewed.

02

Roofing is our origin trade

The new roof is built by a team that started in roofing.

03

Our own framing crews

The upper floor is framed by people who work for us.

04

Licensed, bonded & insured

CSLB License #893048, B-General and C-39 Roofing. You can verify it with the Contractors State License Board.

What clients say

What homeowners say about their projects.

Selected excerpts from public Google and Yelp reviews of Ocean Seven Builders, quoted as written.

Ocean Seven Builders handled both our new roof and a room addition, and it was a big project for us. Ron made the whole thing feel manageable. … The addition took a bit longer, but the end result looks great and feels like it’s always been part of the home.

Patricia Mace

Google review · Roofing + addition

He was really easy to deal with and explained everything really well. He does not use subs, his people work for him. Ron was also at the job every day and made sure I knew what was going on.

Kenny MacPherson

Google review · Roof replacement

Super happy we went with Ocean Seven Builders for our addition project. … The extra room completely changed our home and gave us the space we badly needed!

Noah Lopez

Google review · Room addition

Homeowner guides

Room addition guides for homeowners.

Reading for anyone thinking of building up: single vs. second story, suites and permits.

AI-generated design concept of a family room addition with a vaulted, beamed ceiling and a tall peaked window bringing daylight in where the new roof ties in higher than the rest of the house

Room Addition Guides

Family Room Additions: Daylight, Roof Tie-Ins and Connecting to the House

How a family room addition's roof ties into the existing roof, how much daylight you can realistically add, and how the new

November 13, 2026

AI-generated interior design concept showing a primary bedroom opening directly into an ensuite bathroom with built-in closets flanking the doorway

Room Addition Guides

Primary Suite Additions: Coordinating Plumbing, Electrical and HVAC

How plumbing, electrical and HVAC actually get routed into a new primary suite wing, and how those utility decisions shape the bedroom-bath-closet

November 8, 2026

AI-generated before-and-after design concept of a one-story house's exterior, showing a new bedroom wing added onto the back with matching roofline and siding

Room Addition Guides

Bedroom Additions: Privacy, Circulation and Storage That Fit the House

How to place a new bedroom for privacy, reach it without cutting through another room, plan storage that actually fits, and tie

October 30, 2026

Room additions FAQ

Room addition questions, answered by professionals.

Building out or up, structure, permits, cost drivers and living through construction: what to know before you add space.

Should I build a single-story or second-story addition?

It depends on your lot, your existing structure and how you want to live during construction. Building out uses yard space, while building up preserves it but requires the existing house to carry a second floor. Our single-story vs. second-story addition guide compares both, and you can also explore single-story additions and second-story additions.

Not always without changes. A structural evaluation of the existing foundation and framing is essential, and in many cases they need strengthening first. We measure the house and coordinate structural engineering before the design is finalized.

Yes. Additions require plans, structural engineering where load is involved, plan check and inspections. We coordinate this in-house. Our guide to home improvement permits in Los Angeles explains each stage.

Timelines depend heavily on scope, structure and city review, so we set the schedule at the estimate rather than quoting a generic figure. The proposal lays out the milestones.

With a single-story addition, families can often stay in most of the house. A second story usually involves opening the roof, so some families plan to move out for part of the project. We discuss this early because it affects your budget.

We match rooflines, window proportions, exterior finishes and interior floor levels, so the addition looks like it was always there. That is why design and planning matter as much as construction.

Each city sets limits on how close you can build to property lines and how much of the lot can be covered. A site survey early in the process shows how much room you actually have to build out.

Yes. Adding a bathroom or extending a kitchen means planning plumbing, drainage, ventilation and electrical as part of the design. We coordinate these from the start.

Yes. Layout studies, architectural drawings and structural engineering are coordinated in-house, so you work with one team. See addition design & planning.

We provide a fixed, line-item proposal. The main cost drivers are the foundation, structural work, the roof tie-in or new roof, utilities and the finishes you select.

A single-story addition needs a carefully detailed tie-in to the existing roof. A second-story addition usually means a new roof over the whole house, which makes it a good time to review roofing options.

Homeowner guides

From the Ocean Seven blog.

Practical guides from a Los Angeles general contractor on roofing, additions, kitchens and permits, so you can plan your project with confidence.

AI-generated design concept of a detailed architectural scale model of a single-story home with a central courtyard, surrounded by landscaping and other study models on a design studio table

New Construction Guides

Design-Build Homes: Who Owns Which Decisions, and How Coordination Works

How decision ownership works under a design-build contract: which calls the homeowner makes, which the design-build team makes, when each needs to

November 15, 2026

AI-generated design concept of a family room addition with a vaulted, beamed ceiling and a tall peaked window bringing daylight in where the new roof ties in higher than the rest of the house

Room Addition Guides

Family Room Additions: Daylight, Roof Tie-Ins and Connecting to the House

How a family room addition's roof ties into the existing roof, how much daylight you can realistically add, and how the new

November 13, 2026

AI-generated before-and-after design concept comparing a dated dark-tile small bathroom with a shower curtain to a renovated version with a light vanity and frameless glass shower

Bathroom Remodeling Guides

Small Bathroom Remodeling: Clearances, Visual Openness and Storage That Works

The clearances a small bathroom layout has to meet, the finish and layout moves that make the room read larger, and how

November 12, 2026

Start your project

Talk with a Los Angeles general contractor.

Tell us roughly what you have in mind. Then we will come out, measure, listen and send a fixed line-item proposal, free and with no pressure attached.

Office

Ocean Seven Builders, Inc.
15155 Stagg St Unit # 2
Van Nuys, CA 91405
Get directions

Hours

Monday–Friday 7:00am–7:00pm
Saturday 8:00am–4:00pm · Sunday closed

License

CSLB #893048 · B-General · C-39 Roofing
Licensed, bonded & insured

Request a consultation

Six quick fields. A sentence or two about the project is plenty.