Home Improvement Permits in Los Angeles: A Homeowner’s Guide

Short answer: most structural, electrical, plumbing, mechanical and roofing work on a Los Angeles home needs a permit, while purely cosmetic updates such as paint often do not. Who issues the permit depends on where the property is: the Los Angeles Department of Building and Safety (LADBS) for homes inside the City of Los Angeles, a city building department for separate cities such as Burbank, Glendale, Pasadena or Santa Monica, and Los Angeles County Public Works for unincorporated areas. Simple scopes can often be permitted without plan review, while additions, structural changes and new homes go through plan check before work starts, followed by inspections during construction.

Home improvement permits in Los Angeles exist to make sure work is designed and built safely, and they create a record that matters when you sell, refinance or file an insurance claim. Many homeowners are unsure which projects need one, who issues it and what the process involves. This guide explains the process in plain terms, compares the main permit paths, and lists what to prepare and what to expect at each step. It is general information rather than legal advice, so always confirm the requirements for your specific address.

Modern two-story home at dusk with warm interior lighting
Design concept reference of a modern two-story home.

Who issues home improvement permits in Los Angeles?

Los Angeles County is made up of many separate cities, and each has its own rules and building department. Homes inside the City of Los Angeles, including neighborhoods such as Sherman Oaks, Encino, Woodland Hills, Brentwood and Venice, are permitted by LADBS. Cities such as Pasadena, Burbank, Glendale, Santa Monica and Beverly Hills have their own building departments. Unincorporated communities fall under Los Angeles County Public Works, which also provides building services to some incorporated cities.

The first step is always to confirm which agency covers your address. LADBS suggests checking your property in ZIMAS, the City Planning department’s zoning tool; if the property cannot be found there, it may be outside the City of Los Angeles. Los Angeles County Public Works offers an online service locator that shows which office issues permits for an address.

Projects that usually need a permit

The California Building Standards Code, as summarized by the Contractors State License Board, says no building or structure may be erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished without a permit from the building official. In practice, the projects that most often need one include:

  • Room additions, second-story additions and accessory dwelling units
  • New construction and structural changes, such as removing a load-bearing wall
  • Roof replacement
  • Kitchen and bathroom remodels, especially those that move plumbing, gas or electrical
  • New windows or doors, and changes to the size of openings
  • Electrical panel upgrades and new circuits
  • Water heater, HVAC and plumbing fixture replacements and additions
  • Retaining walls, demolition, pools and solar installations

Separate trade permits are often needed for plumbing, electrical and mechanical work in addition to the building permit. For example, an open-concept kitchen that removes a wall will need plans and a permit; our guide to removing a wall for an open-concept kitchen explains why that structural work is planned early.

Express permit or plan check: which path fits your project?

LADBS uses several permit paths, and other departments use similar ones under different names. The table below summarizes the City of Los Angeles paths for common home projects. Your building department makes the final determination for your scope.

Permit path (LADBS)What it isTypical home projectsWhat you need
Express permitNo plan check; issued online or by appointment at a permit counterRe-roof with Class A or B coverings; kitchen or bathroom remodel with no structural changes; same-size window and door change-outs; re-stucco; replacing water heaters and plumbing fixtures; same-size HVAC replacementScope details and property information; homeowners and contractors can apply online
Counter plan checkPlan review for simple projects, issued over the counterSmall scopes that need drawings but are straightforward to reviewPlans showing the work and supporting information
Expanded counter plan checkPlan review for modest projectsMedium-sized home additionsArchitectural plans, structural details or calculations as required
Regular plan checkFull plan review for large or complex projectsLarge additions, second stories, new homes and complex structural workComplete plan set, engineering, energy compliance and clearances from other departments
Preliminary plan checkA meeting with a plan check engineer before submittingProjects with code or site questions you want answered earlyA detailed list of questions and any available drawings

LADBS also accepts electronic plan submissions through its ePlanLA system, and Los Angeles County Public Works uses its EPIC-LA online system for permit applications, plan uploads, fee payment and status tracking.

What the permit process looks like

1. Confirm zoning and property information

Zoning determines what can be built on a lot, including setbacks and how much floor area is allowed. Overlay districts, specific plans, hillside rules and historic designations can add requirements. Checking these first avoids designing something that cannot be approved.

2. Prepare plans and documentation

Larger projects such as additions need architectural drawings and, where load is involved, structural engineering. Energy compliance documentation is also part of most plan sets: buildings whose permit applications are submitted on or after January 1, 2026 must comply with California’s 2025 Energy Code (Title 24, Part 6). For City of Los Angeles building permits, LADBS also asks for proof of ownership and information about a permitted construction waste hauler, and notes that construction contractors in California must be licensed by the CSLB.

3. Plan check and clearances

The building department reviews the plans for code compliance and may return comments that need responses or revisions before approval. Some projects also need clearances from other agencies. In the City of Los Angeles these can include City Planning, the Bureau of Engineering, the Fire Department, Sanitation and the Department of Water and Power. Review times vary by city and by project, so no contractor can promise an approval date.

4. Permit issuance and inspections

Once the permit is issued, work can begin. LADBS requires an inspection before any work is covered or concealed, and work is generally inspected and approved in succession. Common inspection items include foundation excavations, concrete, wood framing, plumbing, electrical, shear wall nailing and roof nailing. At each inspection, the permit, the approved plans and, for building permits, the Building Card need to be on site.

5. Final inspection and sign-off

After the final inspection, the permit is finaled. Keep the paperwork, including the signed inspection record, because buyers and lenders often ask for it when you sell.

Rules that apply during construction

  • Working hours: in the City of Los Angeles, permitted construction and demolition hours are 7:00 a.m. to 9:00 p.m. Monday through Friday and 8:00 a.m. to 6:00 p.m. on Saturday, with no work on Sunday. Some hillside areas have additional restrictions.
  • Changes to the plans: if the work needs to vary from the approved plans, the change generally needs approval before it is built.
  • Permit time limits: permits expire if work does not start or stalls for too long. Ask your building department about the time limits that apply.
  • Hazard zones: properties in mapped seismic hazard zones, such as areas prone to liquefaction or landslides, can require additional geologic or soils investigation, and homes in a Very High Fire Hazard Severity Zone have wildfire-resistant construction requirements, including a Class A roof covering.

What permits add to cost and schedule

Permit fees are only part of the picture. The factors that affect cost and timing include the project’s size and valuation, whether plan check is required, the design and engineering needed for the submission, any soils or geology reports, energy compliance documentation, clearances from other agencies, utility work, and the number of inspections. LADBS publishes an online permit fee calculator for estimating City of Los Angeles fees. Building permit time into the plan from the start keeps it from becoming a surprise.

Why skipping permits is a bad idea

Unpermitted work can cause problems with insurance claims, refinancing and resale. It may also have to be opened up for inspection or removed later, which usually costs more than permitting it at the start. LADBS notes that permitted work is not approved until it has been inspected and accepted. Treat home improvement permits in Los Angeles as part of the project plan from the very beginning.

Be cautious if a contractor suggests skipping a permit or asks you to pull an owner-builder permit for work they are doing. The CSLB explains that an owner-builder takes on responsibilities, and risks, that normally belong to the contractor.

Homeowner checklist before you apply: confirm which agency covers your address; check zoning, hillside, historic and hazard-zone status; decide whether the scope fits an express permit or needs plan check; confirm who prepares the plans and engineering and who submits them; check your contractor’s license on the CSLB website; and make sure your contract states who pulls the permit. Under California law, the down payment on a home improvement contract generally cannot exceed 10 percent of the contract price or $1,000, whichever is less.

How Ocean Seven handles permits

  1. Scope and jurisdiction. We confirm the building department for your address and which permit path your scope is likely to need.
  2. Design and documentation. For projects that need plan check, plans, structural details and energy documentation are prepared for submission. Our design and planning page explains this stage.
  3. Submission and corrections. The application is submitted and plan check comments are answered until the permit is issued.
  4. Inspections. Work is scheduled around the required inspections so nothing is covered before it is approved.
  5. Final. After the final inspection, you receive the documentation for your records.

Read more on our permits page.

Why homeowners choose Ocean Seven

Ocean Seven Builders is a family-owned general contractor based in Van Nuys with over 30 years of industry experience, operating as Ocean Seven Builders since 2007. We are a Licensed California contractor, CSLB #893048 (B General Building, C-39 Roofing). Our work includes custom homes and new construction, complete home remodeling, kitchen and bathroom remodeling, room additions, ADU construction and conversions, commercial and residential roofing, and waterproofing. We offer online estimates, our team works in English and Spanish, and we serve homeowners across Los Angeles, Orange, Riverside and Ventura counties. See all of our service areas.

Frequently asked questions

Do I need a permit for a kitchen or bathroom remodel in Los Angeles?

Usually, yes. In the City of Los Angeles, a kitchen or bathroom remodel with no structural changes is listed as an express permit, which does not require plan check. Moving walls, adding windows or other structural changes typically require plans and plan check. Separate plumbing and electrical permits may also apply.

Do I need a permit to replace my roof?

A roof replacement generally requires a permit and inspections. In the City of Los Angeles, re-roofing with Class A or B roof coverings is an express permit, a Class A covering is required in Very High Fire Hazard Severity Zones, and a rated cool-roof product applies when more than half of a residential roof is replaced. Our roof repair or replacement guide covers this in more detail.

How do I know if my home is in the City of Los Angeles?

A Los Angeles mailing address does not always mean the City of Los Angeles. Check your property in ZIMAS, the city’s zoning tool, or use Los Angeles County Public Works’ service locator, which shows which office issues permits for your address.

How long does plan check take?

It depends on the city, the project type and how complete the submission is. Simple scopes may qualify for an express permit or counter plan check, while additions and new homes go through longer review. No contractor can promise an approval date, so build review time into your schedule.

Who should pull the permit, me or my contractor?

For work done by a licensed contractor, the contractor normally pulls the permit. Pulling an owner-builder permit makes you responsible for the work and for meeting code, and the CSLB warns homeowners about the risks of doing so when someone else is actually doing the work.

What happens if work was done without a permit?

Unpermitted work can complicate a sale, refinance or insurance claim. Building departments generally handle it by having a permit applied for and the work inspected, and the inspector may need walls or finishes opened to see it. Ask your building department how it handles permits for existing unpermitted work.

Permits for specific projects

Planning an addition? Our comparison of single-story vs. second-story additions covers the structural and zoning questions involved. Replacing a roof? Our guide to the best roof for Los Angeles homes explains material choices that also affect the permit. Remodeling a kitchen? See our kitchen remodel planning guide.

Want help understanding what your project needs? Request a consultation or call (310) 903-7869. Ocean Seven Builders is based at 15155 Stagg St Unit 2, Van Nuys, CA 91405.

Related reading

Sources and further reading

What homeowners say on Google

4.9 out of 5 from 33 Google reviews (as shown on Google, November 12, 2026)

Our home needed a new roof badly, and while we were already remodeling, we decided to update the master bathroom too. Ocean Seven Builders handled both projects and did an incredible job. Ron coordinated everything so well that we never felt overwhelmed even with two major projects happening together. The bathroom d...

Crystal G., Google review (June 2026)

Ocean Seven Builders did an amazing job replacing our asphalt shingle roof. We had been putting this project off for years because we were worried it would turn into a stressful mess, but Ron made the process simple from start to finish. He was patient while we compared shingle colors and answered every little quest...

Stephanie R., Google review (May 2026)

Super happy we went with Ocean Seven Builders for our addition project. We met with a few companies before deciding, but Ron felt the most honest and straightforward. No weird sales pressure, just normal conversations and realistic expectations. The project stayed pretty close to schedule and the quality of the work...

Noah L., Google review (May 2026)

Read Ocean Seven Builders reviews on Google

Request a consultation

Tell us about your project. We reply by phone or email, or call (310) 903-7869.

Request a consultation

Six quick fields. A sentence or two about the project is plenty.

Call (310) 903-7869Request an Estimate