Top-rated addition contractor · 4.9 on Google

Professional Bathroom
Additions

Ocean Seven Builders designs and builds professional bathroom additions, from half baths and hall bathrooms to ensuites and accessible bathrooms, with plumbing, drainage, waterproofing and ventilation planned properly from the start.

Illustrative image

Illustrative image: new full bathroom addition

Illustrative image

One more bathroom

A bathroom addition where the house needs it most.

Few things cause more daily friction than too few bathrooms. Morning queues, guests sharing with the family and bedrooms without an ensuite are common in older homes built when one or two bathrooms were the norm. A bathroom addition solves that by creating a new bathroom exactly where the household needs it, whether that is off a hallway, beside a bedroom or near the living areas for guests.

Bathrooms are among the most technical rooms in a house. Drains must slope correctly to the sewer line, vents must run through the roof, showers must be fully waterproofed and fans must exhaust moisture outside. Consequently, the location of a new bathroom is often decided as much by plumbing as by layout. Our process starts with a site visit to check the existing plumbing and find the most practical place for the new room.

From there, we coordinate design, engineering and permits, and our own crews build the addition. Because we are also a bathroom remodeling contractor, the bathroom itself is finished with the same care as our dedicated bathroom projects.

Bathroom additions explained

A homeowner’s guide to bathroom additions.

Location is decided by plumbing

The best place for a new bathroom is often where the plumbing can reach most easily. Drains must slope continuously to the main sewer line, and every fixture needs a vent that rises through the roof. On a slab foundation, new drains may require trenching through the floor, while a raised foundation offers more flexibility. Therefore, we look at the existing plumbing first and then plan a bathroom addition layout that works with it.

Half bath, full bath or ensuite?

A half bath, with a toilet and sink, is the simplest to add and suits guests near the living areas. A full bath adds a shower or tub and serves bedrooms. An ensuite is a full bathroom attached to a specific bedroom, usually the primary bedroom. Each type has different space needs, and the choice affects the budget as much as the size. Our primary suite page covers ensuites in detail.

Waterproofing and ventilation

Water damage is the most common long-term problem in bathrooms. Showers need a continuous waterproof membrane beneath the tile, correctly sloped floors and properly sealed niches and benches. In addition, an exhaust fan must vent moisture outside rather than into the attic. These steps are invisible once the bathroom is finished, but they determine whether it lasts for decades.

Designing for accessibility

A bathroom addition is an ideal moment to plan for the future. A curbless shower, a wider doorway, a comfort-height toilet and blocking in the walls for future grab bars cost little when built in. As a result, the bathroom works for young children, aging parents and anyone recovering from an injury, without looking clinical.

Hot water and comfort

Bathrooms far from the water heater can take a long time to deliver hot water. A recirculation system or a dedicated water heater solves that. Heated floors, good lighting and a well-placed window also make a small bathroom feel comfortable and bright.

Permits and inspections

Bathroom additions require building and plumbing permits, with inspections of the foundation, framing, plumbing rough-in and final installation. We coordinate those inspections as part of the project, and our permit guide explains the process in general terms.

Is it time?

Signs you need another bathroom.

These are the most common reasons homeowners decide to add a bathroom rather than remodel an existing one.

01

Morning queues

Several people share one bathroom on a tight schedule.

02

Guests use the family bathroom

A powder room or guest bath keeps private spaces private.

03

No ensuite

The main bedroom has no bathroom of its own.

04

Aging relatives at home

A ground-floor accessible bathroom supports multigenerational living.

05

A growing family

More bedrooms often mean more bathrooms are needed.

06

Outdoor living and pools

A bathroom near the yard keeps wet feet out of the house.

07

Resale value

The ratio of bathrooms to bedrooms matters to buyers.

08

Room near existing plumbing

A spot near current drain lines makes an addition practical.

Adding a whole suite? See primary suite additions. Updating an existing bathroom instead? See our bathroom remodeling services.

What we deliver

What our bathroom additions include.

A bathroom addition combines construction and careful plumbing. These are the stages of every one we build.

Illustrative image: bathroom addition exterior

Illustrative image

01

Site visit and plumbing check

We locate existing drains, vents and supply lines and choose the most practical position.

02

Layout and design

Fixtures, storage and lighting are planned for comfort and easy cleaning.

03

Engineering and permits

Structure, plumbing and energy requirements are coordinated through plan check.

04

Foundation and framing

The addition is built by our crews and tied into the existing roof.

05

Plumbing and venting

Drain, waste, vent and supply lines are installed and inspected.

06

Waterproofing and ventilation

Showers and wet areas are waterproofed and an exhaust fan is ducted outside.

07

Tile, fixtures and walkthrough

Tile, vanity, fixtures and glass are installed, followed by final inspection.

Popular types

Bathroom additions for every need.

Bathrooms range from small powder rooms to full ensuites. These are four types homeowners add most often.

Illustrative image: ensuite bathroom addition

A private bathroom attached to a bedroom, often with a walk-in shower.

Best for: primary and guest bedrooms

Illustrative image

Illustrative image: small half bath addition

A toilet and sink near the living areas, ideal for guests.

Best for: entertaining and family rooms

Illustrative image

Illustrative image: accessible bathroom addition

A curbless shower, grab bar blocking and space to move freely.

Best for: aging in place

Illustrative image

Illustrative before-and-after concept: hallway bathroom addition

A new shared bathroom added off an existing hallway.

Best for: growing families

Illustrative before-and-after concept

How it works

How a bathroom addition runs.

Five steps from the first measurement to the final walkthrough, with one team responsible throughout.

01

Site visit

We check existing plumbing and decide where the bathroom fits best.

02

Design & engineering

Layout, fixtures and structure are designed and engineered.

03

Proposal & permits

A fixed, line-item proposal, followed by plan check and the permit.

04

Construction

Structure, plumbing, waterproofing, tile and fixtures.

05

Final walkthrough

Final inspection, punch list and warranty documentation.

Planning your budget

What affects the cost of a bathroom addition.

Bathroom additions combine construction and plumbing. These are the factors that drive the cost most.

01

Distance to plumbing

Longer drain and vent runs add labor and materials.

02

Bathroom type

A half bath is far simpler than a full bath with a large shower.

03

Tile and finishes

Tile coverage, stone and glass enclosures vary widely in cost.

04

Fixtures

Vanities, faucets and toilets range from standard to premium.

05

Water heating

Distant bathrooms may need recirculation or an additional water heater.

06

Accessibility features

Curbless showers and wider doors add some detailing.

How we price it: a fixed, line-item proposal after a site visit, with structure, plumbing and finishes listed separately.

Why Ocean Seven

Why homeowners choose our top-rated addition team.

A new bathroom needs building and plumbing expertise. These are the reasons homeowners trust us with both.

The Ocean Seven Builders team on a job site
One teamStructure to tile
01

Additions and bathrooms together

We build additions and remodel bathrooms, so both halves get expert attention.

02

Waterproofing done properly

Showers and wet areas are waterproofed before tile, every time.

03

Roofing expertise

Vent penetrations and roof tie-ins are detailed by a team that started in roofing.

04

Licensed, bonded & insured

CSLB License #893048, B-General and C-39 Roofing. You can verify it with the Contractors State License Board.

What clients say

What homeowners say about their projects.

Selected excerpts from public Google and Yelp reviews of Ocean Seven Builders, quoted as written.

Our home needed a new roof badly, and while we were already remodeling, we decided to update the master bathroom too. Ocean Seven Builders handled both projects and did an incredible job. … The bathroom design came out modern, functional, and relaxing …

Crystal Green

Google review · Roofing + bathroom

Super happy we went with Ocean Seven Builders for our addition project. … The project stayed pretty close to schedule and the quality of the work really impressed us.

Noah Lopez

Google review · Room addition

Ocean Seven Builders handled both our new roof and a room addition, and it was a big project for us. Ron made the whole thing feel manageable.

Patricia Mace

Google review · Roofing + addition

Homeowner guides

Bathroom & addition guides for homeowners.

Reading for anyone adding a bathroom: walk-in showers, layouts, suites and permits.

AI-generated design concept of a family room addition with a vaulted, beamed ceiling and a tall peaked window bringing daylight in where the new roof ties in higher than the rest of the house

Room Addition Guides

Family Room Additions: Daylight, Roof Tie-Ins and Connecting to the House

How a family room addition's roof ties into the existing roof, how much daylight you can realistically add, and how the new

November 13, 2026

AI-generated before-and-after design concept comparing a dated dark-tile small bathroom with a shower curtain to a renovated version with a light vanity and frameless glass shower

Bathroom Remodeling Guides

Small Bathroom Remodeling: Clearances, Visual Openness and Storage That Works

The clearances a small bathroom layout has to meet, the finish and layout moves that make the room read larger, and how

November 12, 2026

AI-generated interior design concept showing a primary bedroom opening directly into an ensuite bathroom with built-in closets flanking the doorway

Room Addition Guides

Primary Suite Additions: Coordinating Plumbing, Electrical and HVAC

How plumbing, electrical and HVAC actually get routed into a new primary suite wing, and how those utility decisions shape the bedroom-bath-closet

November 8, 2026

Room additions FAQ

Room addition questions, answered by professionals.

Building out or up, structure, permits, cost drivers and living through construction: what to know before you add space.

Should I build a single-story or second-story addition?

It depends on your lot, your existing structure and how you want to live during construction. Building out uses yard space, while building up preserves it but requires the existing house to carry a second floor. Our single-story vs. second-story addition guide compares both, and you can also explore single-story additions and second-story additions.

Not always without changes. A structural evaluation of the existing foundation and framing is essential, and in many cases they need strengthening first. We measure the house and coordinate structural engineering before the design is finalized.

Yes. Additions require plans, structural engineering where load is involved, plan check and inspections. We coordinate this in-house. Our guide to home improvement permits in Los Angeles explains each stage.

Timelines depend heavily on scope, structure and city review, so we set the schedule at the estimate rather than quoting a generic figure. The proposal lays out the milestones.

With a single-story addition, families can often stay in most of the house. A second story usually involves opening the roof, so some families plan to move out for part of the project. We discuss this early because it affects your budget.

We match rooflines, window proportions, exterior finishes and interior floor levels, so the addition looks like it was always there. That is why design and planning matter as much as construction.

Each city sets limits on how close you can build to property lines and how much of the lot can be covered. A site survey early in the process shows how much room you actually have to build out.

Yes. Adding a bathroom or extending a kitchen means planning plumbing, drainage, ventilation and electrical as part of the design. We coordinate these from the start.

Yes. Layout studies, architectural drawings and structural engineering are coordinated in-house, so you work with one team. See addition design & planning.

We provide a fixed, line-item proposal. The main cost drivers are the foundation, structural work, the roof tie-in or new roof, utilities and the finishes you select.

A single-story addition needs a carefully detailed tie-in to the existing roof. A second-story addition usually means a new roof over the whole house, which makes it a good time to review roofing options.

Homeowner guides

From the Ocean Seven blog.

Practical guides from a Los Angeles general contractor on roofing, additions, kitchens and permits, so you can plan your project with confidence.

AI-generated design concept of a detailed architectural scale model of a single-story home with a central courtyard, surrounded by landscaping and other study models on a design studio table

New Construction Guides

Design-Build Homes: Who Owns Which Decisions, and How Coordination Works

How decision ownership works under a design-build contract: which calls the homeowner makes, which the design-build team makes, when each needs to

November 15, 2026

AI-generated design concept of a family room addition with a vaulted, beamed ceiling and a tall peaked window bringing daylight in where the new roof ties in higher than the rest of the house

Room Addition Guides

Family Room Additions: Daylight, Roof Tie-Ins and Connecting to the House

How a family room addition's roof ties into the existing roof, how much daylight you can realistically add, and how the new

November 13, 2026

AI-generated before-and-after design concept comparing a dated dark-tile small bathroom with a shower curtain to a renovated version with a light vanity and frameless glass shower

Bathroom Remodeling Guides

Small Bathroom Remodeling: Clearances, Visual Openness and Storage That Works

The clearances a small bathroom layout has to meet, the finish and layout moves that make the room read larger, and how

November 12, 2026

Start your project

Talk with a Los Angeles general contractor.

Tell us roughly what you have in mind. Then we will come out, measure, listen and send a fixed line-item proposal, free and with no pressure attached.

Office

Ocean Seven Builders, Inc.
15155 Stagg St Unit # 2
Van Nuys, CA 91405
Get directions

Hours

Monday–Friday 7:00am–7:00pm
Saturday 8:00am–4:00pm · Sunday closed

License

CSLB #893048 · B-General · C-39 Roofing
Licensed, bonded & insured

Request a consultation

Six quick fields. A sentence or two about the project is plenty.