- Home
- New Construction
- Ground-Up Residential Construction
Top-rated home builder · 4.9 on Google
Professional Ground-Up
Home Construction
Ocean Seven Builders provides professional ground-up home construction on empty lots and after demolition. Site work, utilities, foundations, framing, roofing and finishes are built by one team, with plans and permits coordinated from the start.
- Licensed & insured · CSLB #893048 · B-General · C-39 Roofing
- In-house framing crews
- Every phase, one team
Illustrative image
Illustrative image
Building from scratch
Ground-up home construction, from bare lot to finished home.
Ground-up home construction means building everything new: the site work, the utility connections, the foundation, the structure, the envelope and every finish inside. It is the most complete project a builder can take on, and it suits owners with an empty lot, a teardown or an older house that is no longer worth remodeling.
Because nothing already exists, every decision is yours, but every risk is also new. Soil conditions, drainage, utility capacity and access all have to be confirmed before the design is final. That is why our ground-up residential construction starts with a site review and continues with coordinated drawings, engineering and a fixed, line-item proposal before any work begins on the lot.
From there, our own crews carry the build through site preparation and foundations, framing, roofing, rough-in systems and finishes. One team manages every handoff, so the home moves from stage to stage without the gaps that appear when several separate contractors share a project.
- Empty lots, teardowns and infill sites
- Site work, utilities and engineered foundations
- Framing, roofing and envelope by our own crews
- Permits and inspections coordinated throughout
Ground-up building explained
A homeowner’s guide to ground-up home construction.
What makes ground-up construction different
A remodel works with an existing structure, while a ground-up project builds every layer new. That brings real advantages. The foundation can be designed for the soil, the framing can be laid out for the plan you want, and the insulation, windows, roofing and systems can all be chosen to work together. On the other hand, the owner is responsible for decisions that a remodel inherits, such as utility capacity, drainage and how the house sits on the lot. Ground-up residential construction therefore rewards careful planning more than any other project type.
Teardown or empty lot?
Many new homes are built where an older house once stood. A teardown adds demolition and sometimes the removal of old foundations, pools or trees, but it often comes with existing utility connections and an established neighborhood. An empty lot, by contrast, may need new connections and more site work. In both cases, a site review before design begins is the best way to avoid surprises later.
Why the site work decides so much
Grading, drainage and foundations are the least visible parts of a new home, yet they protect everything above them. A pad that drains away from the house keeps water out of crawl spaces and slabs. Foundations sized for the soil prevent cracking and movement. Retaining walls on sloping lots hold the ground in place. Our site preparation and foundations page explains each step in detail.
From frame to weather-tight shell
Once the foundation is in, the house rises quickly. Walls, floors and roof structure are framed, sheathed and inspected. Then the roof, windows, doors and waterproofing make the shell weather-tight, which allows the interior work to proceed regardless of the weather. Because our crews handle both framing and roofing, the transitions between them, where many new homes leak, are detailed by one team. Our framing page covers this stage.
Systems, inspections and finishes
Next, plumbing, electrical and HVAC are roughed in and inspected before insulation and drywall close the walls. After that, cabinetry, tile, flooring, fixtures and paint transform the structure into a home. Throughout the build, the city inspects key stages, and we schedule those inspections so they do not hold up the work. Our permit guide explains what the city typically reviews.
How long a ground-up build takes
Design and city review come first, and their length varies by project. Once construction begins, the company’s typical range for a ground-up home is eight to fourteen months, depending on size, site conditions and finish level. Our article on how long it takes to build a home breaks the timeline down phase by phase.
Related new construction services
Talk with a professional
Get honest advice and a fixed, line-item proposal from a top-rated team.
Good candidates
When building from the ground up makes sense.
Remodeling keeps part of the existing house. In some situations, however, starting fresh is the better investment.
You own an empty lot
A vacant parcel needs every stage of construction, from grading to finishes.
The existing house is failing
Severe foundation, framing or water damage can make replacement more practical.
The layout cannot be fixed
When almost every wall would move, a new home is often simpler than a remodel.
The lot is worth more than the house
Good lots with dated, small homes are common teardown candidates.
You need a different footprint
Changing the size, height or position of the house usually means building new.
You want modern performance
New insulation, glazing, roofing and systems are easiest to build in from scratch.
You are building an ADU or guest house
A detached unit is a ground-up project at a smaller scale.
You want a single warranty
A new home built by one company has one team standing behind the whole house.
Not sure whether to remodel or rebuild? Our planning and budgeting service compares both, and our budget guide explains the main cost drivers.
Stage by stage
What ground-up construction includes.
Every new home moves through the same core stages. These are the stages we manage and build on a ground-up project.
Illustrative image
Demolition and clearing
Existing structures, vegetation and debris are removed, and the site is made safe and ready.
Grading and utilities
The pad is graded for drainage, and water, sewer, gas and power connections are planned and installed.
Engineered foundations
Footings, slabs or stepped foundations are formed, reinforced and poured to the structural plans.
Framing and structure
Walls, floors, beams and roof structure are framed by our crews and inspected before closing in.
Roof and envelope
Roofing, windows, doors, waterproofing and exterior finishes make the house weather-tight.
Rough-in and insulation
Plumbing, electrical and HVAC are roughed in and inspected, then insulation and drywall follow.
Finishes and handover
Cabinetry, tile, flooring, fixtures and paint are installed, followed by final inspection and walkthrough.
Key stages
The stages of a ground-up home.
Each stage depends on the one before it. Choose a stage to learn how we handle it in more detail.
Clearing, grading and drainage create a stable, level pad for the new home.
Best for: empty lots and teardowns
Illustrative image
Framing, sheathing, roofing and windows turn the frame into a weather-tight shell.
Best for: every new home
Illustrative image
Plumbing, electrical and HVAC are installed and inspected before walls are closed.
Best for: coordinated, inspected systems
Illustrative image
Finishes, landscape and outdoor living are completed so the home is ready to enjoy.
Best for: move-in ready homes
Illustrative image
How it works
How a ground-up build runs.
Five phases from the bare lot to the keys, with one team responsible throughout.
Site review
We check the lot, survey, zoning, utilities and access before design is finalized.
Plans & engineering
Drawings and structural engineering are coordinated with budget feedback along the way.
Proposal & permits
A fixed, line-item proposal and milestone schedule, followed by plan check and the permit.
Construction
Site work, foundations, framing, roofing, systems and finishes, inspected at each required stage.
Handover
Final inspection, punch list, walkthrough and warranty documents.
Planning your budget
What affects the cost of ground-up construction.
A new home is priced from its plans and its lot. These are the factors that drive the cost most.
Demolition and clearing
Removing an existing house, pool or trees adds to the early site work.
Soil and slope
Poor soils and sloping lots can require deeper or stepped foundations and retaining walls.
Utility connections
Distance to services and required upgrades vary widely between lots.
Size and layout
Square footage, number of stories and complexity of the plan shape the structure.
Envelope and roofing
Window packages, roofing systems and exterior finishes vary in cost and performance.
Interior finishes
Cabinetry, stone, tile and fixtures are often the largest variable in the budget.
How we price it: after a site review and with the plans in hand, we provide a fixed, line-item proposal with clear allowances for selections still to be made.
Why Ocean Seven
Why owners choose our top-rated building team.
A ground-up build has many stages and many handoffs. These are the reasons owners trust us to manage all of them.
Every stage, one company
Site work, structure, roofing and finishes are coordinated under one contract.
Our own framing and roofing crews
The structure and the roof are built by people who work for us.
Clear pricing
Line-item proposals show what each stage costs and which allowances remain open.
Licensed, bonded & insured
CSLB License #893048, B-General and C-39 Roofing. You can verify it with the Contractors State License Board.
What clients say
What clients say about building with us.
Selected excerpts from public Google and Yelp reviews of Ocean Seven Builders, quoted as written.
Ocean Seven Buiilders, Inc helped me build my back guest house just as I had pictured it. They built my plans with the Engineering. They managed everything I did not have to worry about any permits any drawings.
Cindy M.
Yelp review · Guest house
I then learned that roofing was only one part of his business, and he can build you a house from the ground up and his re-modeling work is fantastic.
Kenny MacPherson
Google review
We met with a few companies before deciding, but Ron felt the most honest and straightforward. No weird sales pressure, just normal conversations and realistic expectations.
Noah Lopez
Google review · Room addition
Homeowner guides
New construction guides for homeowners.
Reading before you build from the ground up: timelines, budgets, delivery methods and permits.
New Construction Guides
November 15, 2026
New Construction Guides
November 9, 2026
New Construction Guides
November 4, 2026
New construction FAQ
New construction questions, answered by professionals.
Custom homes, design-build, budgets, permits and timelines: what to expect when you build from the ground up.
Do you build custom homes in Los Angeles?
Yes. We build custom homes from the ground up, from site preparation and foundations through framing, envelope and finishes. See custom home construction and ground-up residential construction.
Can you work with my architect or existing plans?
Yes. We can build from your architect’s plans, or coordinate architectural design and structural engineering for you. Either way, we review the plans for buildability and budget before construction. See architectural design coordination.
What is design-build?
Design-build means one team is responsible for both the design and the construction. As a result, cost and constructability are considered while the home is being designed, rather than after the drawings are finished. See design-build homes.
How long does new home construction take?
It depends on size, complexity, site conditions and city review. As a guide, the company’s typical range for ground-up new construction is eight to fourteen months. Your schedule is set out in the proposal.
Do you handle permits and inspections?
Yes. Plans, structural engineering and city permits are coordinated in-house from concept through final inspection. Because requirements and review times vary by city, no contractor can promise an approval date. Our guide to home improvement permits in Los Angeles explains the stages.
What happens before construction starts?
We evaluate the site, review the survey and any required reports, confirm feasibility and setbacks, and develop the budget. In addition, utilities, access and drainage are planned before work begins. See site preparation & foundations.
How do you set a construction budget?
We prepare a fixed, line-item proposal. Materials, milestones and allowances are listed separately, so you can see what is firm and which figures depend on your selections. See construction planning & budgeting.
Who does the framing?
Our framers are employed directly rather than subcontracted, so the crew that frames your home works for us. Foundations and structural elements are built to the engineered plans. See framing & structural construction.
Do you build modern and luxury homes?
Yes. We build a range of architectural styles, including modern homes with large glazing and open plans, as well as luxury homes with detailed finishes. See modern home construction and luxury home construction.
Can you demolish an existing house and rebuild?
Yes. Many ground-up projects on established lots start with demolition, which usually needs its own permit. We plan demolition as part of the overall project schedule.
How involved will I be during construction?
You get weekly progress updates, and a principal is on site for walkthroughs and milestones. Decisions about selections are made early, so construction is not held up waiting for choices. See new construction process.
What warranty comes with a new home?
Every project carries a written workmanship warranty, plus manufacturer warranties on installed products such as roofing, windows and finishes. Specific terms are set out in your contract.
Where we work
Service areas across Los Angeles & beyond.
As a Los Angeles general contractor based in Van Nuys, we serve homeowners across Los Angeles County, Orange County, San Bernardino County and Marin County.
Los Angeles County
- Agoura Hills
- Alhambra
- Altadena
- Arleta
- Bel Air
- Beverly Glen
- Beverly Hills
- Brentwood
- Burbank
- Calabasas
- Canoga Park
- Cerritos
- Eagle Rock
- Encino
- Glendale
- Hawthorne
- Hidden Hills
- Highland Park
- Hollywood
- La Cañada Flintridge
- Lake Balboa
- Lakewood
- Malibu
- Manhattan Beach
- Marina del Rey
- Mission Hills
- Monrovia
- Newhall
- North Hollywood
- Panorama City
- Pasadena
- Redondo Beach
- Reseda
- San Gabriel
- Santa Monica
- Sherman Oaks
- Sierra Madre
- South Pasadena
- Studio City
- Tarzana
- Valley Glen
- Valley Village
- Van Nuys
- Venice
- West Hollywood
- Winnetka
- Woodland Hills
Orange County
San Bernardino County
Marin County
Ventura County
Riverside County
One office, not a network of branches. Everything runs out of 15155 Stagg St Unit # 2, Van Nuys, CA 91405. These are the areas our crews travel to; there is no branch office in any of them.
Homeowner guides
From the Ocean Seven blog.
Practical guides from a Los Angeles general contractor on roofing, additions, kitchens and permits, so you can plan your project with confidence.
New Construction Guides
November 15, 2026
Room Addition Guides
November 13, 2026
Bathroom Remodeling Guides
November 12, 2026
Start your project
Talk with a Los Angeles general contractor.
Tell us roughly what you have in mind. Then we will come out, measure, listen and send a fixed line-item proposal, free and with no pressure attached.
Phone
Office
Ocean Seven Builders, Inc.
15155 Stagg St Unit # 2
Van Nuys, CA 91405
Get directions
Hours
Monday–Friday 7:00am–7:00pm
Saturday 8:00am–4:00pm · Sunday closed
License
CSLB #893048 · B-General · C-39 Roofing
Licensed, bonded & insured
Request a consultation
Six quick fields. A sentence or two about the project is plenty.