Top-rated kitchen remodeling contractor · 4.9 on Google

Professional
Kitchen Remodeling

Ocean Seven Builders is a professional kitchen remodeling contractor for complete remodels, open-concept layouts, custom cabinets, countertops and islands. Layout, structure and selections are planned before work begins, so your kitchen is built once and built right.

Indoor-outdoor great room with large glazed openings

Professional kitchen remodeling

A kitchen remodeling contractor that plans before it builds.

The kitchen is the room the whole house uses. It is where mornings start, where homework gets done and where guests end up, whatever the size of the living room. As a result, a kitchen that does not work affects everyone, every day.

That is why our work as a professional kitchen remodeling contractor starts with how you use the space, not with catalogs. First we look at how you cook, store and gather. Then we test layouts, address any structural changes, such as opening a wall, and lock in selections before construction. Our guide to planning a kitchen remodel walks through the same steps.

Next, every cabinet, countertop, appliance and fixture is priced as a line item, so the budget is clear before demolition. Our own crews then build the kitchen, coordinate plumbing, electrical and ventilation, and keep the site clean while you live in the rest of the house.

Kitchen remodeling services

Every part of your kitchen, one top-rated remodeling team.

From a full remodel to a new island and lighting plan, these are the professional kitchen services we design and build. Choose one to learn more.

Kitchen layouts

The best kitchen layouts for how you live.

The layout decides how a kitchen feels every day. These are the directions homeowners ask about most, and each has its own structural and utility needs.

Open kitchen with a waterfall-edge island and bar seating

One large island handles prep, seating and storage, so the plan often needs structural work to open up around it.

Best for: families who cook and gather together

Indoor-outdoor great room with large glazed openings

One continuous room. However, it needs a beam line where the old wall was and ventilation that works without a wall to hide it.

Best for: entertaining and open-plan living

Custom wine room opening onto a living area

Wine storage, glazed cabinetry or a display wall planned as part of the kitchen instead of an afterthought.

Best for: collectors and entertainers

Modern courtyard with a pool

Large glass openings onto a terrace or courtyard, so the header, floor transition and roof line all change.

Best for: homes with outdoor living space

Kitchen remodeling explained

What a professional kitchen remodel really involves.

Function first, finishes second

The best kitchens start with how the room is used. Where do you prep, where do you clean up, and where do people gather while you cook? Answering these questions shapes the layout, and the layout then decides where cabinets, appliances and lighting go. As a result, finishes become the final layer of a plan that already works, rather than the starting point.

Layout and structure

Keeping the sink, range and refrigerator in place is often the most cost-effective approach, because plumbing, gas and venting stay where they are. However, many homeowners want to open the kitchen to the living area. That usually means removing or altering a wall, and if the wall carries load, a properly engineered beam and a permit are required. Our guide to an open-concept kitchen remodel explains what is behind the wall.

Cabinets, countertops and islands

Cabinetry and countertops drive much of the budget and most of the look. Cabinets should be planned around what you store, with drawers where they make daily tasks easier. Countertop materials differ in durability and care, so our countertop comparison is worth reading before you choose. An island adds prep space and seating, provided there is enough clearance around it.

Living through a kitchen remodel

A professional remodel has a clear sequence: demolition, any structural work, rough plumbing and electrical, inspections, then cabinets, counters and finishes. The company’s typical range for remodels is six to twelve weeks, depending on scope. Meanwhile, daily cleanup and dust control protect the rest of the house, and most families set up a temporary kitchen for part of the project.

Before you remodel

What to decide before demolition.

A kitchen remodel stays on budget when the big decisions are made on paper first, while changing your mind is still free.

Keep the layout or open it up?

Keeping major appliances and the sink in place avoids moving plumbing, gas and venting, which is one of the best ways to control cost. Opening a wall, on the other hand, can transform the house, but it needs engineering and a permit. Our guide to an open-concept kitchen remodel explains what is involved.

Open kitchen with a waterfall-edge island and bar seating

How it works

How a kitchen remodel runs.

Five steps from the first walkthrough to the final punch list, so you know what happens next and when.

01

Walkthrough

We look at the kitchen, measure the space and listen to what is not working and what you want instead.

02

Layout & selections

Layout options come first, then cabinets, counters, appliances, tile, fixtures and lighting are chosen and priced.

03

Proposal & permits

You receive a fixed, line-item proposal and schedule, and we coordinate permits where the scope requires them.

04

Construction

Demolition, any structural work, rough plumbing and electrical, then cabinets, counters and finishes, with daily cleanup.

05

Final walkthrough

We walk the finished kitchen with you, close the punch list and hand over warranty and appliance documentation.

Recent work

Kitchens and living spaces we have built.

Ocean Seven’s own project photography of kitchens and the living spaces around them. Open any image to view it larger.

Why Ocean Seven

Why homeowners choose our top-rated kitchen team.

A kitchen remodel touches structure, utilities and finishes at once. These are the reasons homeowners trust us with it.

The Ocean Seven Builders team on a job site
In-houseCrews on payroll
01

Planned before it is built

Layout, structure and selections are settled on paper first, so costly changes do not happen after demolition.

02

Structural work handled

Opening a wall needs an engineered beam and a permit; we coordinate both as part of the remodel.

03

Line-item selections

Cabinets, counters, appliances and fixtures are priced separately, and allowances are clearly marked.

04

In-house crews

Our finishers are employed directly, so the people who start your kitchen are the people who finish it.

05

Licensed, bonded & insured

CSLB License #893048, B-General and C-39 Roofing. You can verify it with the Contractors State License Board.

06

Clean, respectful job sites

Daily cleanup and dust containment, because the rest of your home is still in use.

What clients say

What homeowners say about our remodeling work.

Selected excerpts from public Google and Yelp reviews of Ocean Seven Builders, quoted as written.

What stood out most was communication. Ron kept us updated throughout the whole kitchen renovation so we never felt out of the loop. The crew worked efficiently and respected our home, which we appreciated. There were no major surprises, and everything stayed pretty close to the original timeline. The final result is beautiful and very functional!

Michael Minkler

Google review · Kitchen remodel

I then learned that roofing was only one part of his business, and he can build you a house from the ground up and his re-modeling work is fantastic. His prices are very fair and he works well within a budget.

Kenny MacPherson

Google review

The job went really, really well, he was using very good materials, and his crew was very professional. He left everything clean and they were license and insured.

Emily Hu

Google review

Homeowner guides

Kitchen remodeling guides for homeowners.

Reading for anyone planning a new kitchen: the planning process, open-concept layouts, countertops and permits.

AI-generated design concept of a luxury kitchen with a waterfall marble island, brass pendant lights and a marble slab backsplash

Kitchen Remodeling Guides

Luxury Kitchen Remodeling: Coordinating Finishes and Building a Specification-Led Budget

How to coordinate stone, cabinetry, hardware and lighting as one specification in a luxury kitchen remodel, and why a detailed spec, not

November 11, 2026

AI-generated before-and-after design concept comparing a traditional wood-cabinet kitchen to a modern white kitchen with flat-panel cabinetry and a linear pendant light

Kitchen Remodeling Guides

Modern Kitchen Remodeling: Clean Detailing, Storage and Task Lighting

What makes a kitchen remodel read as modern: a storage-first planning order, a three-layer lighting plan with real task lighting, a restrained

November 6, 2026

A finished kitchen island with a white stone waterfall countertop and six wood-leg counter stools under pendant lighting

Kitchen Remodeling Guides

Complete Kitchen Remodeling: Scope, Temporary Kitchen and Selection Order

What a complete kitchen remodel scope should include, how to run a temporary kitchen during construction, and the order to lock in

October 28, 2026

Kitchen remodeling FAQ

Kitchen remodeling questions, answered by professionals.

Layouts, structural changes, cabinets, countertops, permits and timelines: what to know before you remodel your kitchen.

Where should I start when planning a kitchen remodel?

Start with how the kitchen should work for you, then choose a layout, address structural changes, and finally lock in selections. Our guide to planning a kitchen remodel walks through each step, and kitchen design & planning explains our process.

Usually, yes. If the wall carries load, it needs a properly engineered beam and posts, plus a permit. We coordinate the structural engineering during planning, so it is not discovered during demolition. See open-concept kitchen remodeling.

The company’s typical range for remodels is six to twelve weeks, depending on scope. A kitchen that keeps its footprint generally moves faster than one with structural changes and relocated utilities.

A permit is usually required when plumbing, gas, electrical or structural work changes. Purely cosmetic updates often do not need one. Our guide to home improvement permits in Los Angeles explains when permits apply.

Yes. We plan and install custom cabinetry with you, including construction, finish, hardware and interior storage. See custom kitchen cabinets.

Common choices include quartz and natural stones such as granite, quartzite and marble. Each differs in appearance, maintenance and durability, so we help you compare them alongside edge details such as waterfall ends. See kitchen countertops.

An island adds prep space, seating and storage, but it needs enough clearance on every side for people to pass and appliance doors to open. We test this during layout planning. See kitchen islands & layouts.

Yes. Keeping the sink, range and major appliances in place avoids relocating plumbing, gas and venting, which is one of the most effective ways to manage a kitchen budget.

We layer task lighting over work surfaces, ambient lighting for the room and accent lighting for cabinets or features. Lighting is planned with the layout rather than added at the end. See kitchen lighting & finishes.

For part of the project, yes. Most families set up a temporary kitchen elsewhere in the home. We explain the sequence in advance so you can plan for it.

Yes. Smaller kitchens benefit most from careful layout, storage planning and lighting, and they can often be improved without moving walls. See small kitchen remodeling.

Yes. We remodel kitchens in a range of styles, from clean modern designs to luxury kitchens with custom detailing. See modern kitchen remodeling and luxury kitchen remodeling.

Homeowner guides

From the Ocean Seven blog.

Practical guides from a Los Angeles general contractor on roofing, additions, kitchens and permits, so you can plan your project with confidence.

AI-generated design concept of a detailed architectural scale model of a single-story home with a central courtyard, surrounded by landscaping and other study models on a design studio table

New Construction Guides

Design-Build Homes: Who Owns Which Decisions, and How Coordination Works

How decision ownership works under a design-build contract: which calls the homeowner makes, which the design-build team makes, when each needs to

November 15, 2026

AI-generated design concept of a family room addition with a vaulted, beamed ceiling and a tall peaked window bringing daylight in where the new roof ties in higher than the rest of the house

Room Addition Guides

Family Room Additions: Daylight, Roof Tie-Ins and Connecting to the House

How a family room addition's roof ties into the existing roof, how much daylight you can realistically add, and how the new

November 13, 2026

AI-generated before-and-after design concept comparing a dated dark-tile small bathroom with a shower curtain to a renovated version with a light vanity and frameless glass shower

Bathroom Remodeling Guides

Small Bathroom Remodeling: Clearances, Visual Openness and Storage That Works

The clearances a small bathroom layout has to meet, the finish and layout moves that make the room read larger, and how

November 12, 2026

Start your project

Talk with a Los Angeles general contractor.

Tell us roughly what you have in mind. Then we will come out, measure, listen and send a fixed line-item proposal, free and with no pressure attached.

Office

Ocean Seven Builders, Inc.
15155 Stagg St Unit # 2
Van Nuys, CA 91405
Get directions

Hours

Monday–Friday 7:00am–7:00pm
Saturday 8:00am–4:00pm · Sunday closed

License

CSLB #893048 · B-General · C-39 Roofing
Licensed, bonded & insured

Request a consultation

Six quick fields. A sentence or two about the project is plenty.