Short answer: plan a kitchen remodel in five steps and in this order: decide how the kitchen should work, choose the layout, understand the structural and utility work that layout requires, lock in selections before construction, and plan the schedule, including a temporary kitchen. Each step sets the limits for the next. Most budget overruns in kitchen remodels come from making these decisions out of order, for example choosing cabinets before confirming that a wall can come out or that the range can move.
Planning a kitchen remodel well is the best way to keep it on schedule and on budget. In Los Angeles homes, the biggest decisions are usually layout, structure and selections, and they need to be made in that order. When those choices are settled on paper first, the build goes more smoothly and there are fewer costly changes once walls are open.
This guide is a planning overview: the five steps, the questions to answer at each one, the factors that drive cost, and how permits work. When you are ready for the detailed order of cabinet, appliance, countertop and finish decisions, our guide to complete kitchen remodel scope and selection order picks up where this one ends. Because many kitchen remodels involve electrical, plumbing or structural work, our guide to home improvement permits in Los Angeles is useful reading too.

Step 1: Decide how the kitchen should work
Start with how you cook, eat and gather rather than with finishes. A family that entertains often may want a large island with seating, while a serious cook may prioritize uninterrupted counter space between the sink and the range. Writing down what is not working today is a simple and effective first step. Useful questions to answer before any design work:
- How many people cook at the same time, and do they get in each other’s way today?
- Where do people eat day to day: at an island, a table in the kitchen or a separate dining room?
- What is missing: counter space, pantry storage, a place for small appliances, a second sink?
- Does the kitchen need to connect to the living room, the backyard or both?
- Are there accessibility or aging-in-place needs, such as wider walkways or lower work surfaces?
- Do you plan to stay in the home long term, or is resale the main consideration?
The answers become the brief for the design. They also help you decide which features are essential and which are nice to have if the budget gets tight later.
Step 2: Choose a layout
Common layouts include a galley, an L-shape, a U-shape, an L-shape with an island, and a fully open kitchen connected to the living area. Each one has trade-offs, and the right one depends on the room’s dimensions, where doors and windows sit, and where the plumbing and gas already run.
| Layout | Works well for | Trade-offs |
|---|---|---|
| Galley | Narrow rooms; one main cook; efficient work zones on two facing walls | Tight for two cooks; can feel closed off from the rest of the house |
| L-shape | Corner kitchens; leaves floor space for a table or island | Corner cabinets need good storage hardware; long runs between zones |
| U-shape | Maximum counter and cabinet space in a defined room | Can feel enclosed; the opening must be wide enough for two people |
| L-shape with island | Families who want prep space and seating in one place | The island needs clearance on all sides; plumbing or power in the island adds work |
| Open kitchen or peninsula | Homes where cooking, dining and living should feel connected | Often requires structural changes; ventilation, lighting and acoustics affect the whole space |
- Island layouts need enough clearance for people to pass and for appliance and cabinet doors to open.
- Open-concept kitchens often require structural changes.
- Moving the sink, dishwasher or range means moving plumbing, gas or venting, which adds cost and permit scope.
Our kitchen islands and layouts page goes further into clearances and island design.
Step 3: Understand the structural and utility work
Opening a kitchen to a living room usually means removing or altering a wall. If that wall carries load, it needs a properly engineered beam and posts, and the project moves from a simple remodel permit to plan check. Open-concept kitchens therefore frequently cost more than the cabinets alone suggest. Our article on removing a wall for an open-concept kitchen explains what is involved.
Utility work is the other half of this step. Before the layout is final, confirm:
- Plumbing: whether the sink, dishwasher and any island sink can drain and vent where you want them.
- Gas and electric: whether the range will stay gas or switch to electric or induction, and whether the electrical panel has capacity for new appliances and circuits.
- Ventilation: how the range hood will exhaust to the outdoors, through a wall or the roof.
- Lighting and outlets: where task lighting, under-cabinet lighting and countertop outlets will go.
- Older-home conditions: outdated wiring, galvanized pipes or lead-based paint in homes built before 1978, which affects how demolition is done.
Settling these items on paper is what keeps surprises out of the middle of the project. Some conditions can only be confirmed once walls are open, so the proposal should explain how concealed conditions are handled.
Step 4: Lock in selections
Cabinetry, countertops, appliances, tile, fixtures and lighting drive much of the budget, so they should be chosen and priced before construction begins. A proposal that lists each selection, or clearly marks any allowance and what it covers, makes it easier to see where the money is going and to adjust if needed.
- Cabinets: construction, finish and interior storage. See custom kitchen cabinets.
- Countertops: material, edge profile and waterfall ends. Our countertop materials comparison covers the options.
- Appliances: sizes and power or gas requirements, confirmed before cabinets are ordered.
- Lighting: layered task, ambient and accent lighting. See kitchen lighting and finishes.
- Plumbing fixtures and tile: sink type and mounting, faucet, backsplash and flooring.
The order matters: appliance specifications set cabinet openings, cabinets set countertop templates, and countertops set the backsplash. Our selection order guide walks through that sequence in detail. Changes after ordering are possible, but they ripple, and California law requires changes to a home improvement contract to be in writing.
Step 5: Plan the schedule
How long a kitchen remodel takes depends on scope. A kitchen that stays in the same footprint generally moves faster than one that involves structural changes and new utility runs, and the permit path, inspection scheduling and product lead times all affect the calendar. Ask for a written sequence of the main phases and which ones depend on inspections or deliveries.
- Design and permits: drawings, engineering if a wall is involved, and the permit itself.
- Ordering: custom cabinets, appliances and specialty fixtures often need to be ordered well ahead.
- Demolition and rough-in: structural work, plumbing, electrical and ventilation, followed by inspections.
- Finishes: drywall, cabinets, countertop templating and installation, backsplash, fixtures and appliances.
- Final inspection and punch list.
Plan for a temporary kitchen setup, because you will be without a working kitchen for part of the project. A table with a microwave, a small refrigerator and a coffee maker in another room, plus a nearby sink for washing up, makes the weeks without a kitchen much easier.
What drives the cost of a kitchen remodel
- Layout changes: keeping the footprint versus moving the sink, range or walls.
- Structural work: beams, posts and engineering for an open plan.
- Utilities: new circuits, panel capacity, gas or plumbing reroutes and hood ducting.
- Cabinetry: stock, semi-custom or custom, plus interior storage hardware.
- Countertops and backsplash: material, thickness, edge details and waterfall ends.
- Appliances: sizes, fuel type and built-in or panel-ready models.
- Flooring and lighting: especially when an open plan carries the floor into adjoining rooms.
- Existing conditions: older wiring, plumbing or lead-safe work requirements.
Permits for a kitchen remodel in Los Angeles
In the City of Los Angeles, the Department of Building and Safety (LADBS) lists a kitchen or bathroom remodel for residential buildings with no structural changes as an express permit, which can be issued online or at a permit counter. Homeowners applying for single-family dwelling express permits may apply for building, mechanical, electrical and plumbing permits. If the remodel includes structural changes, such as removing a load-bearing wall, it needs plans and plan check. Homes in other cities or in unincorporated Los Angeles County go through their own building departments.
For homes built before 1978, the U.S. EPA’s Renovation, Repair and Painting Rule requires that anyone paid to perform work that disturbs painted surfaces be certified and trained in lead-safe work practices, which affects how demolition is planned.
Homeowner checklist before signing: write down what the kitchen must do before choosing finishes; confirm the layout works with existing plumbing, gas and venting or that relocation is in the scope; ask whether any wall work is structural and what permit path applies; confirm every selection or allowance is listed in the proposal; ask for the sequence of phases and a plan for the temporary kitchen; and check the contractor’s license on the CSLB website. Under California law, the down payment on a home improvement contract generally cannot exceed 10 percent of the contract price or $1,000, whichever is less.
Planning a kitchen remodel within a bigger project
Sometimes the kitchen is part of a larger plan, such as a kitchen extension added to the back of the house. In that case, read our comparison of single-story vs. second-story additions. Similarly, if the roof is due for replacement, our guide to the best roof for Los Angeles homes explains the material choices, and it is worth sequencing roofing before interior finishes.
Why homeowners choose Ocean Seven for kitchen remodeling
Ocean Seven Builders is a family-owned general contractor based in Van Nuys with over 30 years of industry experience, operating as Ocean Seven Builders since 2007. We are a Licensed California contractor, CSLB #893048 (B General Building, C-39 Roofing). Kitchen and bathroom remodeling and complete home remodeling are core parts of our work, alongside room additions, new construction and roofing. We offer online estimates, our team works in English and Spanish, and we serve homeowners across Los Angeles, Orange, Riverside and Ventura counties, including South Pasadena and Pasadena.
Frequently asked questions
Where should I start when planning a kitchen remodel?
Start with how the kitchen should work: who cooks, where people eat, and what is missing today. That brief drives the layout, the layout drives the structural and utility work, and only then should cabinets and finishes be chosen and priced.
Do I need a permit for a kitchen remodel in Los Angeles?
Usually yes. In the City of Los Angeles, a kitchen remodel with no structural changes qualifies for an LADBS express permit, with separate mechanical, electrical and plumbing permits as needed. Structural changes, such as removing a load-bearing wall, require plans and plan check. Other cities and unincorporated county areas have their own rules.
How long does a kitchen remodel take?
It depends on scope. Keeping the same footprint is generally faster than moving walls or utilities, and the permit path, inspections and product lead times all affect the schedule. Ask your contractor for a written sequence of phases and which ones depend on inspections or deliveries.
Should I choose appliances before cabinets?
Yes. Appliance sizes, fuel type and ventilation requirements set the cabinet openings and the utility rough-in, so confirming appliance specifications first avoids reordering cabinets or moving connections later.
Can I stay in the house during a kitchen remodel?
Many homeowners do, with a temporary kitchen set up in another room. Expect periods without water or power in the kitchen area, dust control around the work zone, and some noise. In homes built before 1978, ask how lead-safe practices will be handled during demolition.
Next steps
Learn more about our kitchen remodeling services in Los Angeles, including complete kitchen remodeling and kitchen design and planning.
Ready to plan your kitchen? Request a consultation or call (310) 903-7869. Ocean Seven Builders is based at 15155 Stagg St Unit 2, Van Nuys, CA 91405.
Related reading
- Open-Concept Kitchen Remodel: What Removing a Wall Really Involves
- Complete Kitchen Remodel: Scope and Selection Order
- Kitchen Countertop Materials Compared: Quartz, Granite, Quartzite and Marble
- Home Improvement Permits in Los Angeles: A Homeowner’s Guide
Sources and further reading
- Los Angeles Department of Building and Safety, Information Bulletin: Express Permits (kitchen and bathroom remodels with no structural changes).
- Los Angeles Department of Building and Safety, Homeowner Step-By-Step permit guide.
- U.S. Environmental Protection Agency, Lead Renovation, Repair and Painting Program.
- Contractors State License Board, Contracts and binding agreements (written changes, down payment and cancellation rules).
What homeowners say on Google
4.9 out of 5 from 33 Google reviews (as shown on Google, November 12, 2026)
Our home needed a new roof badly, and while we were already remodeling, we decided to update the master bathroom too. Ocean Seven Builders handled both projects and did an incredible job. Ron coordinated everything so well that we never felt overwhelmed even with two major projects happening together. The bathroom d...
Ocean Seven Builders did an amazing job replacing our asphalt shingle roof. We had been putting this project off for years because we were worried it would turn into a stressful mess, but Ron made the process simple from start to finish. He was patient while we compared shingle colors and answered every little quest...
Super happy we went with Ocean Seven Builders for our addition project. We met with a few companies before deciding, but Ron felt the most honest and straightforward. No weird sales pressure, just normal conversations and realistic expectations. The project stayed pretty close to schedule and the quality of the work...
Request a consultation
Tell us about your project. We reply by phone or email, or call (310) 903-7869.