Short answer: a “complete” kitchen remodel means the layout, cabinet boxes, countertops, appliances, plumbing and electrical are all reworked together, not just a few finishes swapped out. That scope normally takes the kitchen fully out of service, so a working temporary kitchen elsewhere in the house is part of planning, not an afterthought. The selections that drive the schedule should be locked in roughly in order: layout and appliance models first, then cabinets, then countertops and fixtures, because each decision constrains the ones that follow.
Most homeowners start a kitchen remodel with a Pinterest board of finishes: a stone, a cabinet color, a faucet. Finishes matter, but a complete kitchen remodel is defined less by any one material and more by how much gets opened up, and in what order. This guide covers what “complete” should include in your scope, how to keep the household fed and functioning while the kitchen is out of service, and the sequence of decisions that keeps a project on schedule. For a broader walkthrough of the planning process end to end, start with our guide to planning a kitchen remodel in Los Angeles, then come back here for the scope, temporary-kitchen and sequencing details.

What “complete” should cover in a kitchen remodel scope
Not every kitchen project needs to touch the same systems, and the word “complete” means different things to different contractors. On a complete kitchen remodel, the scope normally includes the layout of cabinets, appliances and plumbing fixtures; the cabinet boxes themselves, not just doors and hardware; countertops; a backsplash; lighting and ventilation; and, where the layout changes, moving plumbing and electrical to new locations. It is different from a cosmetic refresh, which keeps the existing layout, plumbing and cabinet boxes and swaps doors, countertops and fixtures, and from an open-concept remodel, which adds removing a wall between the kitchen and an adjacent room; if a wall is part of your plan, see our guide to what removing a kitchen wall really involves before you set a budget.
Two boundaries are worth settling before a contract is signed: whether the floor under the new cabinets is being replaced or patched around the old footprint, and whether the project includes any structural, plumbing or electrical work beyond what the kitchen itself needs, for example a subpanel upgrade to support new appliances, or rerouting a vent stack. Both can change scope and price once the old cabinets and finishes come out and the walls and subfloor are visible.
Setting up a working temporary kitchen
A complete remodel typically takes the kitchen fully out of commission for several weeks, so most households set up a temporary kitchen somewhere else in the house, commonly a garage, dining room, laundry room or basement. A working temporary setup usually needs a countertop surface, a microwave and a portable induction burner or toaster oven, a mini fridge, a sink or at minimum easy access to one, and enough outlets to run appliances without tripping a breaker. Paper plates and takeout cover the first few days for most families, but a real temporary kitchen matters more the longer the project runs.
Two practical details are easy to miss when planning a temporary kitchen: where the refrigerator and any reusable cabinets go during demolition, since movers and demo crews need clear access without tripping over them, and whether the water supply to the temporary sink area can be shut off independently from the kitchen’s plumbing, so the crew can work on kitchen lines without cutting water to the whole house.
| Scope level | What typically changes | What typically stays | Approx. timeline |
|---|---|---|---|
| Cosmetic refresh | Cabinet doors/hardware, countertop, backsplash, paint, fixtures | Layout, cabinet boxes, plumbing and electrical locations | 1-3 weeks |
| Complete remodel, same footprint | All cabinets, countertops, appliances, flooring, lighting; plumbing/electrical reworked in place | Overall room layout and footprint | 6-10 weeks |
| Complete remodel, new layout | Everything above, plus moved plumbing/electrical and a new floor plan | Exterior walls (unless combined with an addition) | 8-14 weeks |
| Open-concept remodel | Everything above, plus removing a wall and often a structural beam | Only the remaining perimeter walls | 10-16+ weeks |

The order kitchen selections should happen in
Kitchens have more interdependent selections than almost any other room, and choosing them out of order is one of the most common causes of change orders and delays. The practical sequence most designers and contractors use runs roughly like this:
- Layout and cabinet configuration. Where the island, sink, range and refrigerator go determines plumbing and electrical rough-in locations, so this has to be settled first.
- Appliance models, not just types. Cabinet openings, countertop cutouts and ventilation duct runs are sized around exact appliance dimensions, so models should be chosen before cabinets are finalized, even if delivery happens later.
- Cabinet boxes and door style. Once layout and appliance sizes are set, cabinets can be ordered; lead times of 6-12 weeks are common and are usually the longest single lead time on the project.
- Countertop material and edge profile. Templating happens after cabinets are installed, but the material should be chosen earlier so fabrication lead time overlaps with cabinet installation instead of adding to it.
- Plumbing and lighting fixtures. Sink, faucet and pendant or under-cabinet lighting should be selected before rough-in inspection, since fixture specs affect rough-in locations and electrical boxes.
- Flooring and paint. Decided and ordered so the crew is not waiting on a sample delivery once cabinets are ready to install.
Selections made out of this order are not fatal, but they are the most common source of mid-project change orders: a countertop chosen after cabinets are already set can force a different edge profile or sink cutout, and an appliance swapped after cabinet openings are built can mean a cabinet rebuild.
Homeowner checklist before signing: ask exactly what “complete” includes in your scope (layout, cabinet boxes, plumbing/electrical, flooring), confirm the cabinet lead time against your temporary kitchen timeline, ask whether appliance models are selected before cabinet doors are ordered, and get the countertop allowance and edge profile in writing before cabinets are finalized.
Video transcript
Island seating for six. One long island anchors the kitchen, with seating built into the finished layout.
Cooktop and storage in the island. A built-in gas cooktop and refrigerated drawers keep cooking and storage in one run.
A second prep zone at the sink. The window-wall sink gives the kitchen two working zones instead of one.
Storage built into every run. Full-height cabinetry along the back wall keeps small appliances and pantry items out of sight.
Open to living and dining. The finished kitchen opens directly to a connected living and dining space.
Ocean Seven Builders (310) 903-7869 | oceansevenbuilders.com
Site conditions that can change the scope
- A subfloor that is not level once old flooring and cabinets are removed, which can require leveling compound or sistered framing before new flooring goes down.
- Plumbing or electrical that does not match older permit records, common in homes remodeled informally before current owners.
- A load-bearing wall or header discovered where plans assumed an open span, relevant for any layout change that widens an opening.
- Insufficient electrical capacity for new appliances, which can require a subpanel or service upgrade.
- Ventilation duct runs that cannot reach an exterior wall in the planned hood location without rerouting.
None of these are unusual, but each is a reason to confirm in writing how the proposal handles conditions found after demolition, the same way unexpected conditions are handled during a re-roof.
How Ocean Seven approaches a complete kitchen remodel
- Design and scope. We confirm what “complete” means for your project, layout, cabinets, countertops, appliances, plumbing, electrical and flooring, in writing.
- Selections in sequence. Layout and appliance models are locked first, then cabinets are ordered, then countertop material and fixtures, so lead times overlap instead of stacking.
- Temporary kitchen planning. We talk through where you’ll cook during construction and sequence demolition so your temporary setup stays usable.
- Demolition and rough-in. Old cabinets, countertops and flooring come out; plumbing and electrical are roughed in to the new layout and inspected.
- Cabinet and countertop installation. Cabinets are installed and leveled, then countertops are templated and fabricated to the installed boxes.
- Finishes and final inspection. Backsplash, lighting, appliances and flooring are completed, the work is inspected as required, and you receive documentation for your records.

Why homeowners choose Ocean Seven for kitchen remodeling
Ocean Seven Builders is a family-owned general contractor based in Van Nuys with over 30 years of industry experience, operating as Ocean Seven Builders since 2007. Kitchen remodeling is one of our core trades alongside bathroom remodeling, room additions, new construction and roofing, and our scope ranges from custom cabinetry and countertop selection to open-concept layouts that remove walls. We offer online estimates, our team works in English and Spanish, and we serve homeowners across Los Angeles County, including Alhambra and the San Gabriel Valley.
Frequently asked questions
When does complete kitchen remodeling make sense?
A complete remodel makes sense when the layout no longer works for how you cook and gather, when cabinets or plumbing are original and near the end of their service life, or when you are already opening walls or floors for another reason and it is more efficient to address the kitchen at the same time. If the layout works and only finishes look dated, a cosmetic refresh is usually faster and less disruptive.
What should an Alhambra homeowner confirm before planning?
Confirm whether your home is in a jurisdiction that requires a separate plan check for electrical panel or plumbing changes, how long the Building Division’s plan-check review typically takes, and whether any planning or zoning review applies if the remodel changes exterior walls or square footage. Alhambra’s Building Division handles permits for city residents; homeowners near the city’s edges should confirm with their contractor which agency has jurisdiction over their exact address.
What scope and selection decisions should be settled first?
Layout and cabinet configuration come first, since they set plumbing and electrical locations. Appliance models should be chosen next, before cabinet openings are finalized, followed by cabinet boxes, countertop material, and plumbing and lighting fixtures. Flooring and paint can be decided last without holding up the schedule.
Which site conditions can change the work?
An uneven subfloor, plumbing or wiring that does not match older permit records, a load-bearing wall where an open span was assumed, insufficient electrical capacity for new appliances, and duct runs that cannot reach an exterior wall in the planned hood location are the most common conditions that change scope once walls and floors are opened up.
What should be included in the written proposal?
A clear proposal should state what “complete” includes (layout, cabinet boxes, plumbing, electrical, flooring), the specific appliance models and countertop material the price is based on, how conditions found after demolition are priced, and the anticipated cabinet and countertop lead times so they can be weighed against your temporary kitchen plan.
Sources and further reading
- National Kitchen & Bath Association, Kitchen Planning Guidelines with Access Standards (clearances, work triangle and landing-area recommendations).
- City of Alhambra, Building Division: permits and plan check.
- California Building Standards Commission, California Building Standards Code (Title 24).
- Energy Code Ace, kitchen range hood airflow and ventilation requirements.
What homeowners say on Google
4.9 out of 5 from 33 Google reviews (as shown on Google, November 12, 2026)
Our home needed a new roof badly, and while we were already remodeling, we decided to update the master bathroom too. Ocean Seven Builders handled both projects and did an incredible job. Ron coordinated everything so well that we never felt overwhelmed even with two major projects happening together. The bathroom d...
Ocean Seven Builders did an amazing job replacing our asphalt shingle roof. We had been putting this project off for years because we were worried it would turn into a stressful mess, but Ron made the process simple from start to finish. He was patient while we compared shingle colors and answered every little quest...
Super happy we went with Ocean Seven Builders for our addition project. We met with a few companies before deciding, but Ron felt the most honest and straightforward. No weird sales pressure, just normal conversations and realistic expectations. The project stayed pretty close to schedule and the quality of the work...
Request a consultation
Tell us about your project. We reply by phone or email, or call (310) 903-7869.